Installation Guide

28
GENERAL INFORMATION INSTALLATION REQUIREMENTSPRE-INSTALLATION INSTALLATION
When installing cabinets next to each other that are different depths (i.e. 12" deep
nextto24"deep),allerorfullheightpanelwillberequiredtomaintainthespacing
of the cabinets.
Ifallerisused,cutthellerequaltotheheightofthewallorbasecabinetface
frame.Thellerwidthshouldmatchthespacefromthecabinetsidetotheedgeof
the face frame.
Beforepositioningthecabinets,attachthellertothefaceframeedgeofthecabinet
already in place using the Frame-to-Frame Attachment section requirements.
13
FILLERS FOR VARIOUS DEPTH
12" Deep Wall Cabinet
12" Deep Wall Cabinet
24" Deep Tall Cabinet to
24" Deep Base Cabinet
Filler