Instructions / Assembly
Installation (continued)
6
A
B
1
1
2
2
3
3
4
4
Installing the ceiling canopy
4
□
□
□
□
Remove the nipple (1), the at washer (2), the lock washer
(3) and the nut (4) from the ceiling canopy (A).
Then, thread the nipple (1) to the uppermost rod (B). Hand-
tighten until snug.
Place the ceiling canopy (A), the at washer (2) and the
lock washer (3) over the nipple (1).
Secure with the previously removed nut (4). Hand-tighten
until snug.
A
□
□
5
Making the electrical connections
AA
CC
Green ground screw
* Use wire connectors (CC) to connect the wires.
Ground Wire:
1. Wrap the supply ground wire around the green ground screw
on the crossbar assembly (AA), no less than 2 in. from the end
of the wire. Tighten the ground screw.
2. Connect the xture ground wire and the canopy ground wire
to the supply ground wire with a wire connector (CC).
Supply Wire:
1. Connect the supply white wire to the white xture supply
wire with a wire connector (CC).
2. Connect the supply black (or red) wire to the black xture
supply wire with a wire connector (CC).
3. Wrap each connection with approved electrical tape and
carefully insert all of the connected wires into the outlet box.