Instructions / Assembly

5 HAMPTONBAY.COM
Please contact 1-855-HD-HAMPTON for further assistance.
Installation
1
Installing the gem bar
Remove the acorn nuts (DD) to separate the gem bar from
the xture.
Install the gem bar (A) on the junction box by securing it
with two screws (AA).
IMPORTANT: If a 4 in. square junction box is used, then a
square to round at converter must be placed to accept the
gem bar provided.
DD
A
AA
2
Connecting the wires
CAUTION: Make sure the main power is off at the fuse or circuit
breaker box. Check the power wires for damage or scrapes. If the
power supply wires are within 3 in. of the ballast power supply, use
wire suitable for at least 90°C (194°F). Most dwellings built before
1985 have supply wire rated to 60°C. Consult a qualied electrician
before installing.
IMPORTANT: All wiring must take place inside the junction box.
Connect the bare copper wire from the xture to the
grounding wire from the power source.
Connect the black wire from the xture to the black wire
from the power source.
Connect the white wire from the xture to the white
(neutral) wire from the power source.
Wrap each wire connection with 2 in. of electrical tape.
Secure all wiring connections together with wire
connectors (EE) and tuck all connections neatly into the
junction box.
Copper/Ground
Wires
Black Wire
White Wire
EE