Installation Guide

3 HAMPTONBAY.COM
Please contact 1-855-HD-HAMPTON for further assistance.
Pre-Installation
PLANNING INSTALLATION
Ensure the countertop is installed and nished (using oil, oil-wax, varnish) before use. Follow the instructions contained in this manual to
keep the warranty valid.
NOTE: Within 24 to 48 hours after unpacking, the countertop must be nished on both sides and all edges.
It is very important to properly coat the countertop with a high quality oil. Finish the counter top surface with
particular regard to all cutting edges and end edges, strictly to the manufacturers’ specications concerning
the oil, wax oil, or varnish.
Keep the countertop at in a fully supported position, away from direct heat and moisture and in the original packaging. This helps to avoid
excessive sanding and wood warpage.
NOTE: Ideally, wooden countertops should be used in an ambient temperature of 32°F - 75°F (18°C - 24°C)
and humidity of 40-60 %.
The following features are completely natural for wood:
Ƒ Differences in color, grain, and will have some knots.
Ƒ Wood darkens with time.
Ƒ Wood is splash proof but not waterproof and wood bers may raise if they are exposed to water for a long time.
Ƒ Wood absorbs moisture from the environment and gives it back, which can make it expand or contract.
TO AVOID CRACKING AND SPLITTING OF WOOD:
Ƒ The installation must allow the wood to move (expand/contract):
Ƒ Use exible adhesives and sealants.
Ƒ Keep a 1/8 in. gap at the wall.
Ƒ Holes in the brackets or blocks must be oversized to allow the fastener to keep the top secure but allow the top to move.
Ƒ Use a exible sealant to secure your sink.
Ƒ Protecting the underside is as important as protecting the top.
Ƒ Seal the top, bottom and all edges.
Ƒ Additional protection may be required above dishwashers.
Ƒ Protect wood-to-wood joints.
Ƒ Seal edges with a water-resistant sealant prior to connecting the joints.
Ƒ Use mechanical fasteners to pull and hold joints together.
65°F