User's Manual

500-24050, Rev. B 3
DRAFT
Prepare the R100
1. Before starting, MARK the position using a level.
2. HOLD the reader body on the outside of the window and POSITION it generally where you would like
it to mount.
Insert Battery
1.
INSTALL the battery, ensuring correct orientation.
2.
VERIFY the reader self tests and beeps once.
Mount the Unit
NOTE 1: The R100 can be mounted using glue or wood screws based on your needs.
NOTE 2:
This following step allows oxygen to enter and aid in the curing process.
1. IF the R100 is mounted using glue,
THEN APPLY glue as a thin thread of glue applied to three sides of the back-plate as shown,
AND DO NOT USE tissue or a brush to spread the adhesive.
NOTE 1: The seal becomes functional within a short time and permanent after 24–72 hours.
NOTE 2: The rate of cure depends on the ambient relative humidity. The best results are achieved
when the relative humidity in the working environment is 40–60% at 22˚C. Lower humidity
leads to a slower cure. High humidity accelerates it, but may impair the final strength of the
bond.
2. Quickly AFFIX to the pre-marked area and HOLD or CLAMP until the adhesive has bonded (at least
five seconds).
Position
mark
Glue line
Battery
A pencil is used to mark
this
p
oint on the window
The cover is
pulled up while
pressing on the
LED