6916-W Call Us First! DO NOT RETURN TO STORE. For questions on assembly or for general inquiries, you may contact us in the following ways: Call customer service: 1-877-743-3400 AVOID THE WAIT! visit us online at help.backyardproducts.com Submit a help request Answers to frequently asked questions Live chat with an agent Did you enjoy building your shed? WANTE JOIN OUR TEAM AND MAKE UP TO $1,500/WEEK* h pl y si tb er ack all t s ya r din .
(This page intentionally left blank.
ASSEMBLY MANUAL 16916-W 03/26/2021 MODERN 12' x 7'-6" (365,8 x 228,6 cm) ACTUAL FLOOR SIZE IS 144" x 90" (365,8 x 228,6 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY. BEFORE YOU BEGIN • BUILDING RESTRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for specific restrictions and/ or requirements before building. .
TOOLS Required ❑ Phillips Optional ❑ Tool Belt/ ❑ Utility Knife Screwdriver Nail Pouch ❑ Shingle Blades ❑ Drill / Driver ❑ 1/4" Drill Bit ❑ 3/8" Drill Bit ❑ 1/2" Drill Bit ❑ #2 Philips Drive Bit ❑ Tin Snips (for drip edge) ❑ Caulk Gun ❑ Pliers ❑ Paint Tools ❑ Hammer ❑ Chalk Line ❑ Safety Glasses ❑ Level ❑ Nail Gun ❑ Pencil ❑ Ladder ❑ Tape Measure ❑ Square • gun nails or ❑ Gloves Safety! Always use approved safety glasses during assembly.
ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed kit includes a complete wood floor system. • This shed kit does not include ANY leveling materials. • See the FLOOR LEVELING section on page 8 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. REINFORCED WOOD FLOOR FRAME (OPTIONAL) IMPORTANT! The included floor has been designed for general use.
Part identification letters are stamped on some parts. RS PARTS IDENTIFICATION AND SIZES WOOD SIZE CONVERSION CHART Treated lumber is stamped: Nominal Board Size Actual Size 2 x 4 ..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) RS 1 x 4 .................3/4" x 3-1/2" (1,9 x 8,9 cm) 2 x 3 ..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) Check these locations for part stamp. 1 x 3 .................3/4" x 2-1/2" (3,8 x 6,3 cm) PARTS LIST INVENTORY YOUR PARTS before you begin.
TRIM PARTS LIST continued...
WALL PANEL & DOORS PARTS LIST x1 x1 x3 3/8" x 48 x 76" (1 x 113,3 x 193 cm) x1 3/8" x 42" x 96" (1 x 106,7 x 243,8 cm) 3/8" x 10-7/16" x 48" (1 x 26,5 x 121,9 cm) x1 x1 3/8" x 42" x 96" (1 x 106,7 x 243,8 cm) x1 3/8" x 4-1/2" x 48" (1 x 11,4 x 121,9 cm) 3/8" x 48" x 96" (1 x 121,9x 243,8 cm) 3/8" x 48" x 84" (1 x 122 x 213,4 cm) x1 3/8" x 48" x 96" (1 x 121,9x 243,8 cm) x1 3/8" x 48" x 84" (1 x 122 x 213,4 cm) x2 DOORS NAIL BOXES x4 BOXES x4 BOXES 3" (7,6 cm) 2" (5,1 cm) FASTENER /
HARDWARE / WINDOWS / Misc. x11 x2 x4 H 2.
FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS • 3" Screws angled into 4x4. • (2) at each point frame • and 4x4 touch. O D 12" (30,5 cm) O R Measurements to center of 4x4's. MATERIAL REQUIRED x2 4 x 4 x 12' (10 x 10 x 365,8 cm)Treated Lumber 12" (30,5 cm) Fasteners for Frame to 4x4. (3" Screws shown as one option.
CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kit on a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete.
FLOOR FRAME PARTS REQUIRED: x10 x2 x2 x44 2 x 4 x 87" (5,1 x 10,2 x 221 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) 3" (7,6 cm) Look for TREATED Stamp 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) BEGIN 1 Orient parts as shown on flat surface. Measure and mark. Secure with (2) 3" nails at each mark. HINT: For easier nailing stand on frame. FINISH Your floor frame is now assembled. Proceed to level and square frame.
LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN 1 See page 8 for the preferred floor leveling method. 2 Use level and check the frame is level before applying floor panels. 3 Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square.
FLOOR PANELS PARTS REQUIRED: x53 2" (5,1 cm) 5/8" x 48" x 96" (1,6 x 121,9 x 243,8 cm) x1 BEGIN 1 Attach the 5/8" x 48" x 96" panel with the rough side up (painted-grid lines side) and with the 48" edge and corner flush to the floor frame (Fig A). Secure panel with (2) 2" nails in the corners. 2 Move to the opposite side. Using the long edge of the panel as a lever, move the panel side-to-side until the top corner is flush to the floor frame (Fig. B). Secure panel with (2) 2" nails in the corners.
FLOOR PANELS PARTS REQUIRED: x1 x123 2" (5,1 cm) x1 5/8" x 42" x 96" (1,6 x 106,7 x 243,8 cm) 4 5/8" x 48" x 90" (1,6 x 60,6 x 122 cm) Continue installing panels with 2" nails spaced 6" apart on edges, and 12" apart inside panels. Flush 6" (15,2 cm) 48" (122 cm) 12" (30,5 cm) 42" (106,7 cm) 90" (228,6 cm) Flush Grid lines up 144" (365,8 cm) Flush DOOR Flush FINISH Your floor panels are now installed.
IMPORTANT! Check the floor frame is level after installing floor panels. Re-level if needed. DOO R • The floor should be used as a stable work surface for wall construction. HINT: • Organize your assembly procedure during the build process to avoid over-handling of the walls.
BACK WALL FRAME PARTS REQUIRED: x2 SP x7 UM x2 TP x32 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark. 2 Use (2) 3" nails at each mark and (4) 3" nails at seams 144" (365,8 cm) HINT: For easier nailing stand on frame.
BACK WALL PANELS PARTS REQUIRED: x47 GAA 48" x 76" (121,9 x 193 cm) x1 3/4" GAUGE BLOCK • Ensure top of panel is overhanging the top of frame by 4". 3 Place 48" x 76" panel onto wall frame with primed side up as shown. Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with 2" nails spaced 6" apart on edges and 12" apart inside panel. 4" (10,2 cm) BEGIN HERE 3/4" (1,9 cm) For squareness maintain 3/4" measurement along panel edges.
BACK WALL PANELS PARTS REQUIRED: x94 2" (5,1 cm) GAA x2 3/4" GAUGE BLOCK 48" x 76" (121,9 x 193 cm) 4 Place center and end 48" x 76" panels on frame as shown (Fig. A, Fig. B). For squareness maintain 3/4" measurement along panel edges. Flush Secure panel with 2" nails spaced 6" apart on edges and 12" apart inside panel. 4" (10,2 cm) 3/4" (1,9 cm) Fig. A 6" (15,2 cm) Primed side up 3/4" GAUGE BLOCK 12" (30,5 cm) 48" (121,9 cm) 3/4" (1,9 cm) For squareness maintain flush along panel edges.
FRONT WALL - DOOR HEADER PARTS REQUIRED: x16 x2 7/16" x 3-1/4" x 66-3/4" (1,1 x 8,3 x 169,5 cm) x2 3" (7,6 cm) x6 OSB 2" (5,1 cm) AM 2 x 4 x 67" (5,1 x 10,2 x 170,2 cm) BEGIN 1 Build header assembly as shown using 3" and 2" nails. Flush AM 3" (7,6 cm) Nails OSB Flush 3-1/4" x 66-3/4" AM Center OSB 2" (5,1 cm) Nails OSB 3-1/4" x 66-3/4" Center OSB FINISH Your door header is now assembled.
FRONT WALL FRAME PARTS REQUIRED: x2 SKA x2 AYA x2 TM x4 PTA x2 OHB x54 2 x 4 x 40" (5,1 x 10,2 x 101,6 cm) 3" (7,6 cm) x5 2 x 4 x 70-1/2" (5,1 x 10,2 x 179,1 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) PPA 2 x 4 x 12-1/8" (5,1 x 10,2 x 30,8 cm) 2 x 4 x 72-1/2" (5,1 x 10,2 x 184,2 cm) 2 x 4 x 86-1/8" (5,1 x 10,2 x 218,8 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark. 2 Use (2) 3" nails at each mark and (4) 3" nails at seams.
FRONT WALL FRAME PARTS REQUIRED: x56 Pre-Assembled Door Header x1 x2 3" (7,6 cm) 4" x 67" (170,2 cm) NCE 2 x 4 x 68-9/16" (5,1 x 10,2 x 174,1 cm) 3 Install door header with OSB to the top of header. Secure header with 3" nails at locations shown. 4 Orient parts NCE on edge as shown. Secure with (2) 3" nails at locations shown. Secure with (4) 3" nails into each side of header. OSB Door Header NCE (4) Nails into Header NCE (4) Nails into Header FINISH Your front wall frame is now complete.
FRONT WALL PANELS PARTS REQUIRED: x58 3/8" x 48" x 96" (1 x 121,9 x 243,8 cm) x1 Install all panels with the primed side facing up. Handle panels with care to avoid breakage. BEGIN 1 Install first 48" x 96" panel 5-7/8" above top plate. Secure panel with 2" nails spaced 6" apart along edges and 12" apart on inside of panels. There will be a 5-7/8” reveal at the top. FRONT PANELS ARE FRAGILE! UNTIL INSTALLED, HANDLE CAREFULLY TO AVOID BREAKING AT CORNERS AND EDGES.
FRONT WALL PANELS PARTS REQUIRED: x1 x1 2 x29 3/8" x 1-1/2" x 9" (1 x 3,8 x 22,9 cm) 3/8" x 4-1/2" x 48" (1 x 11,4 x 121,9 cm) x1 3/8" x 10-7/16" x 48" (1 x 26,5 x 121,9 cm) Install panels in the following order: 1. 10-7/16" x 48" 2. 1-1/2" x 9" 3. 4-1/2" x 48" Secure panels with 2" nails spaced 6" apart. There will be a 5-7/8" reveal at the top of upper panel.
FRONT WALL PANELS PARTS REQUIRED: x1 x2 3" (7,6 cm) x58 OY Temporary Brace 2 x 3 x 72" (5,1 x 7,6 x 182,8 cm) 3/8" x 48" x 96" (1 x 121,9 x 243,8 cm) x1 4 2" (5,1 cm) Install 2nd 48" x 96" panel flush to frame as shown and 5-7/8" from the top. Secure panel with 2" nails spaced 6" apart along edges and 12" apart on inside of panels. 5 Install OY as a temporary brace to maintain 64" (162,6 cm) between studs. Secure with (2) 3" screws.
BACK WALL INSTALLATION PARTS REQUIRED: x1 GKA x2 TEMPORARY 3" (7,6 cm) x12 2 x 3 x 59-1/4" (5,1 x 7,6 x 150,5 cm) 3" (7,6 cm) x27 2" (5,1 cm) BEGIN 1 Center back wall assembly on the 144" floor dimension. Note: The 4" wall overhang is installed to the top. 4" (10,2 cm) Fig. A 2 Use GKA as a temporary brace. Secure GKA with (2) 3" screws (Fig. A). OR DO (3 14 6 5 4" ,8 cm ) GKA 3" (7,6 cm) Screws x2 3 First, nail lower edge of panel to floor frame with 2" nails spaced 6" apart.
FRONT WALL INSTALLATION PARTS REQUIRED x2 OFB x4 TEMPORARY 3" (7,6 cm) x8 2 x 4 x 78-1/16" (5,1 x 10,2 x 198,3 cm) x14 3" (7,6 cm) 2" (5,1 cm) BEGIN 1 2 Center front wall assembly on the 144" front floor dimension. (3 14 6 5 4" ,8 cm ) Use (2) OFB as temporary braces. Level wall and secure OFB with 3" screws. OFB x2 3 Secure lower edge of panel to floor frame with 2" nails spaced 6" apart. Angle nail to hit floor frame (Fig. A). Secure wall bottom plates to floor with 3" nails (Fig. A).
DOUBLER INSTALLATION PARTS REQUIRED: x2 x2 x32 SP 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 122 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Center doublers SP and TP on back wall top plate. Secure using 3" nails evenly spaced. TP Flush 3" (7,6 cm) Nails SP Stagger seams Flush Flush at seam DO OR 2 Center doublers SP and TP on front wall top plate. Secure using 3" nails evenly spaced. 3" (7,6 cm) Nails SP Flush Flush at seam FINISH Your doublers are now installed.
OUTER RAFTER INSTALLATION PARTS REQUIRED: x2 x4 SDC 3" (7,6 cm) x4 2 x 4 x 92-3/16" (5,1 x 10,2 x 234,2 cm) 2" (5,1 cm) BEGIN 1 Install rafters on front and back wall doublers. Ensure rafters are flush to end of top plates (Fig. B, Fig. D). Secure rafters as shown in all Figures. Flush 2" (5,1 cm) Screw 2" (5,1 cm) Screw 3" (7,6 cm) Screw SDC 3" (7,6 cm) Screw 2" (5,1 cm) Screw Fig. C 3" (7,6 cm) Screw R DOO Flush Fig. D SDC 2" (5,1 cm) Screw 3" (7,6 cm) Screw Flush Flush Fig.
OUTER RAFTER INSTALLATION PARTS REQUIRED: 2 x2 x20 H 2.5 Tie Plate Attach tie plates using 1-1/2" nails as shown. 1-1/2" (3,8 cm) Nails FINISH Your outer rafters are now installed.
RAFTERS PARTS REQUIRED: x9 x36 SDC 3" (7,6 cm) x18 2 x 4 x 92-3/16" (5,1 x 10,2 x 234,2 cm) 2" (5,1 cm) BEGIN 1 Measure and mark location of each rafter. Note the door location. 2 Center rafters on marks. Secure rafters using 2" screws installed centered into outer rafter ends (Fig. A). Continue securing rafters using 3" screws angled into doublers (Fig. B). 2" (5,1 cm) Screw Fig. B Fig.
RAFTERS PARTS REQUIRED: 3 x9 H 2.5 Tie Plate x90 1-1/2" (3,8 cm) Attach (9) tie plates using 1-1/2" nails as shown (Fig. A). Fig. A FRON T FINISH Your rafters are now installed.
SIDE WALL PANELS PARTS REQUIRED: x1 OO x2 3" (7,6 cm) TEMPORARY SUPPORT x2 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) 2" (5,1 cm) x1 x1 3/8" x 42" x 96" (1 x 106,7 x 243,8 cm) x1 3/8" x 42" x 96" (1 x 106,7 x 243,8 cm) x1 x1 3/8" x 48" x 84" (1 x 121,9 x 213,4 cm) 1-1/2" (3,8 cm) 3/8" x 48" x 84" (1 x 121,9 x 213,4 cm) BEGIN Center and attach OO as a temporary support. Measure down from floor 1" and mark. Secure to floor joist using (2) 3" screws.
SIDE WALL PANELS PARTS REQUIRED: x41 4 x14 1-1/2" (3,8 cm) 2" (5,1 cm) Place 48" x 84" panel onto side wall flush with bottom of installed 42" x 96" panel. Secure panel with (1) 2" nail in bottom corner (Fig. C). Ensure the measurement between the panel edges are the same along the corner (Fig. F). Secure panel with (1) 1-1/2" nail in upper corner. Remove temporary support OO. 1-1/2" Nails Fig. E Flush Primed side out Fig. C Same Measurement Fig.
SIDE WALL STUDS PARTS REQUIRED: x2 x2 x2 x18 OFB 3" (7,6 cm) 2 x 4 x 78-1/16" (5,1 x 10,2 x 198,3 cm) NES 2 x 4 x 82-1/2" (5,1 x 10,2 x 209,6 cm) KTB 2 x 4 x 86-15/16" (5,1 x 10,2 x 220,8 cm) BEGIN 1 Install NES centered at seam of side wall panels (Fig A). Use a square to ensure 90 degree squareness of studs (KTB, NES and OFB). Flush to rafter Center NES on seam of wall panels. Flush to rafter Flush to rafter Fig.
SIDE WALL PANELS PARTS REQUIRED: x1 (Left / Green) 3/8" x 2-11/16" x 12-1/4" (1,5 x 6,8 x 31,1 cm) x94 x1 (Right / Red) 3/8" x 2-11/16" x 12-1/4" (1,5 x 6,8 x 31,1 cm) BEGIN 1 Install 2-11/16" x 12-1/4" triangular filler panel with (2) 1-1/2" nails. Flush filler panel to installed panels (Red for right side) as shown. 2 Measure and mark location of studs 20" from center of panel seam as shown.
ROOF PANELS PARTS REQUIRED: x1 7/16 x 10-11/16 x 31-7/8" (1,1 x 27,1 x 81 cm) x1 x26 x1 7/16 x 10-11/16 x 28" (1,1 x 27,1 x 71,1 cm) 2" (5,1 cm) GAA 7/16 x 10-11/16 x 96" (1,1 x 27,1 x 243,8 cm) 3/4" GAUGE BLOCK Roof panels may cause serious injury until securely fastened. BEGIN 1 Install all panels with the rough side up (painted-grid lines side). Measure 7-5/8" up from rafter ends and snap a chalk line (Fig. A). Install the 10-11/16" x 96" lower roof panel to the chalk line.
ROOF PANELS PARTS REQUIRED: x1 3 GAA x4 2" (5,1 cm) 3/4" GAUGE BLOCK 7/16" x 48 x 96" (1,1 x 121,9 x 243,8 cm) Square the roof by attaching one 48" x 96" panel at this time. Use the panel's long edge as a lever to bring your roof into square. Place the 48" x 96" roof panel as shown. Use the gauge block to maintain 3/4" at rafter center (Fig. B). Panel should be flush to lower roof panels. Gauge Block Secure with (1) 2" nail in each corner. 48 x 96" (121,9 x 244 cm) DO Fig.
ROOF PANELS PARTS REQUIRED: x12 GAA x1 5 7/16" x 11-7/8" x 96" (1,1 x 30,2 x 243,8 cm) 3/4" GAUGE BLOCK 7/16" x 48" x 96" (1,1 x 121,9 x 243,8 cm) x2 2" (5,1 cm) Install 2nd 48"x 96" panel flush to installed panels. Maintain 3/4" at rafter center. Secure panel with (1) 2" nail in each corner. O D Flush O R Flush 2" Nails Gauge Block Flush 48 x 96" (121,9 x 244 cm) 6 Install 3rd 48"x 96" panel flush to installed panels. 3/4" (1,9 cm) Maintain 3/4" at rafter center.
ROOF PANELS PARTS REQUIRED: 7 x160 2" (5,1 cm) Complete the securing of all upper roof panels with 2" nails 6" along edge and 12" inside panel. 12 " (3 FINISH Your roof panels are now installed.
RAFTER EXTENSIONS PARTS REQUIRED: x11 x28 2" (5,1 cm) QVA 2 x 3 x 10-7/16" (5,1 x 7,6 x 26,5 cm) BEGIN 1 Line up each rafter extension QVA 90o degrees square with rafters as shown. Secure rafter extensions with 2" screws through roof panels (Fig. A). Use (4) screws at roof panel seams. Install QVA extensions flush with side wall panels (Fig. B). HINT: • Use screws at rafter ends as a guide to line up QVA with rafter ends. Fig. B Flush Front Panel Fig. A Fig.
SIDE RAKE FRAMING PARTS REQUIRED: x2 x2 x26 THB 2" (5,1 cm) 1 x 3 x 31-15/16" (2,5 x 7,6 x 81,1 cm) HJ 1 x 3 x 72" (2,5 x 7,6 x 182,8 cm) BEGIN 1 Align THB edge flush with rafter extension (Fig A). Attach with (3) 2" nails (Fig B). 2 Attach HJ flush with THB with (5) 2" nails. (Fig A, FIg. B) 3 Repeat STEPS 1 - 2 on opposite side. Flush Fig. B Angled Ends Flush Flush at seam Fig. A Rafter Extension THB HJ FINISH You have finished installing your gable rake framing.
SIDE SOFFIT PARTS REQUIRED: x14 2" (5,1 cm) x2 3/8" x 5-1/4" x 94-7/16" (1 x 13,3 x 242,5 cm) BEGIN 1 Attach 94-7/16" soffit primed side down flush to front wall panel (Fig. A). Secure to side rake frame THB using (7) 2" finish nails (Fig. A, B). THB THB Fig. A Flush FRONT WALL PANEL Flush 5-1/4" x 94-7/16" (13,3 x 242,5 cm) 2" Finish Nails Fig. B THB Flush 94-7/16" Soffit 2" Finish Nails 2 Repeat STEP - 1 on opposite side. FINISH 3 Your side soffit panels are now installed.
FRONT SOFFIT PARTS REQUIRED: x1 x24 x1 3/8" x 10-3/8" x 75-5/8" (1 x 26,3 x 191,2 cm) 2" (5,1 cm) 3/8" x 10-3/8" x 79-5/8" (1 x 26,3 x 202,2 cm) BEGIN 1 Install 75-5/8" and 79-5/8" soffit panel primed side out under rafter extensions and flush to side wall soffit (Fig. A). Ensure each soffit is flush to front wall panel. Secure soffit panels using (2) 2" finish nails into each rafter extension. Use (4) finish nails at seam (Fig. B).
FRONT FASCIA TRIM PARTS REQUIRED: x1 x10 2" (5,1 cm) WAB 19/32" x 3-1/2" x 60-1/2" (1,5 x 8,8 x 153,7 cm) BEGIN Measure 1/4" past left roof panel and line up WAB primed side out and flush up under roof panels (Fig. A). Right side of WAB is approximately 3/4" from center of rafter extension. Secure WAB with 2" finish nails into rafter extensions (Fig. B). 1 1/4" Flush Fig. A TOP VIEW 3/4" APPROXIMATELY Flush WAB Fig.
FRONT FASCIA TRIM PARTS REQUIRED: x1 2 x14 2" (5,1 cm) ZX 19/32" x 3-1/2" x 96" (1,5 x 8,8 x 243,8 cm) Position ZX primed side out, flush with WAB and flush up under roof panels. Secure ZX with 2" finish nails into rafter extensions (Fig. B). WAB 2" Finish Nails ZX Flush Flush Flush Fig.
SIDE FASCIA TRIM ASSEMBLY PARTS REQUIRED: x1 x1 x2 UDR x2 UDL x2 19/32" x 3-1/2" x 61-1/16" (1,5 x 8,9 x 155,1 cm) 19/32" x 3-1/2" x 61-1/16" (1,5 x 8,9 x 155,1 cm) x28 RMA 2" (5,1 cm) 2 x 3 x 31-15/16" (5,1 x 7,6 x 81,1 cm) WQA 19/32" x 3-1/2" x 45" (1,5 x 8,9 x 114,3 cm) OY 2 x 3 x 72" (5,1 x 7,6 x 182,8 cm) BEGIN 1 To build right side fascia assembly, place RMA and OY end to end on a flat surface (Fig. A). Fig. A OY RMA Place UDR and WQA primed side up and flush with RMA and OY.
SIDE FASCIA TRIM PARTS REQUIRED: x12 LEFT FASCIA ASSEMBLY x1 x18 2" (5,1 cm) 2" (5,1 cm) BEGIN 1 Place left side fascia assembly between roof sheathing and side soffit (Fig. A, Fig. B). 2 Secure fascia assembly under roof panels flush with front fascia board using (6) 2" screws through roof sheathing (Fig. A). ROOF SHEATHING LEFT FASCIA ASSEMBLY LEFT FACIA ASSEMBLY Tight 2" Screws SIDE OF SHED ROOF SHEATHING 2" Screws Fig. B L Fig.
SIDE FASCIA TRIM PARTS REQUIRED: x18 RIGHT FASCIA ASSEMBLY x1 3 Nail up through side soffit into fascia assembly using (7) 2" finish nails (Fig. C). 4 Secure front fascia to side fascia with (2) 2" finished nails (Fig. D). 2" Finish Nails FRONT WALL Fig. D Flush Fig. C 2" Finish Nails 2" Finish Nails 5 Repeat STEPS 1 - 4 on opposite side to install right fascia. FINISH Your side fascia trim is now installed.
REAR FASCIA TRIM PARTS REQUIRED: x1 x1 x2 GKA 3" (7,6 cm) x10 2 x 3 x 59-1/4" (5,1 x 7,6 x 150,5 cm) 2" (5,1 cm) PT 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) BEGIN 1 Install PT and GKA using 2" wood screws through roof sheathing (Fig. A). 2" Screw Fig. A PT & GKA Flush BACK OF SHED PT GKA Fig. B OY PT or GKA 3" Screw 2 Secure PT and GKA using (1) 3" screw through side fascia trim nailer OY (Fig. B).
REAR FASCIA TRIM PARTS REQUIRED: x1 x1 3 x14 HBA 2" (5,1 cm) 19/32" x 3-1/2" x 59-1/4" (1,5 x 8,8 x 150,5 cm) ZX 19/32" x 3-1/2" x 96" (1,5 x 8,8 x 243,8 cm) Secure HBA and ZX to PT and GKA with 2" finish nails (Fig. C). Ensure trim is primed side out. Fig. C ZX HBA Flush ZX & HBA 2" Finish Nail FINISH Your rear fascia trim is now installed.
BACK CORNER TRIM PARTS REQUIRED: x2 x14 2" (5,1 cm) 3/8" x 2" x 73-5/16" (0,9 x 5,1 x 186,2 cm) ¸1 BEGIN Place 73-5/16" back corner trim flush to bottom of back soffit board (Fig. A) and flush with side panel (Fig. B). Secure trim with (14) 2" finish nails into corner wall framing. Space nails equally. Flush to soffit board. SIDE WALL PANEL Fig. A Fig. B Flush 2" (5,1 cm) Finish Nail 73-5/16" Corner Trim FINISH Your back corner trim is now installed.
SIDE CORNER TRIM PARTS REQUIRED: x1 x1 x1 x1 ¸1 x32 2" (5,1 cm) 3/8" x 2" x 73-7/16" (0,9 x 5,1 x 186,5 cm) 3/8" x 2" x 73-7/16" (0,9 x 5,1 x 186,5 cm) 3/8" x 2" x 93-1/8" (0,9 x 5,1 x 236,5 cm) 3/8" x 2" x 93-1/8" (0,9 x 5,1 x 236,5 cm) BEGIN 2 Install 93-1/8" side front-corner trim flush to front wall panel (Fig. A). Secure trim with (9) 2" finish nails spaced evenly. Install 73-7/16" side back-corner trim flush to back wall trim (Fig. B). Secure trim with (7) 2" finish nails spaced evenly. Fig.
FRONT TRIM PARTS REQUIRED: x2 x2 x28 ZD 2" (5,1 cm) 19/32" x 2-1/2" x 72-3/4" (1,5 x 6,3 x 184,8 cm) VAA 19/32" x 2-1/2" x 90-5/8" (1,5 x 6,3 x 230,2 cm) ¸1 BEGIN 2 Install (2) ZD trim pieces centered and flush up to soffit. Secure trim with (14) 2" finish nails into top plate. Space nails evenly. Install VAA corner trim flush to side corner trim (Fig. A). Secure trim with (14) 2" finish nails into wall framing. Space nails evenly. Fig.
FRONT WINDOWS PARTS REQUIRED: x16 x4 ¸1 BEGIN Apply high quality exterior-grade caulk behind frame near edge before installing to seal window. You must caulk around windows to validate warranty. 2 3/4" (1,9 cm) Position window in center of opening and level. Secure with (4) screws on sides of each window.
FRONT WINDOW TRIM PARTS REQUIRED: x2 x5 CMB 19/32" x 5-1/2" x 70-1/4" (1,5 x 14 x 178,4 cm) 3 x34 EY 2" (5,1 cm) 19/32" x 2-1/2" x 9" (1,5 x 6,4 x 22,9 cm) Install (2) CMB centered on front wall panels. Install CMB 1" (2,5 cm) below bottom panel, across door opening. Secure with (18) 2" finish nails as shown. Space nails evenly. Do not nail into window flange. CMB 4 2" (5,1 cm) Finish Nails 1" (2,5 cm) below bottom of panel. Flush CENTER 1" (2,5 cm) below bottom of panel.
FRONT WINDOW TRIM PARTS REQUIRED: x2 x4 TTB 19/32" x 2-1/2" x 58-3/4" (1,5 x 6,3 x 149,2 cm) 5 Install (2) TTB on window trim, centered as shown. Secure with (6) 2" finish nails. 2" (5,1 cm) Finish Nails TTB TTB Nail into FRAMING Flush CENTER You must caulk completely around window frame to validate your warranty. Use a paintable exterior rated caulk. 6 Install (4) 3/4" screws from inside into window trim, as shown. Do not screw into window flange.
DOOR TRIM &THRESHOLD PARTS REQUIRED: x2 x14 x1 TJB 2" (5,1 cm) 64" Metal Threshold 19/32 x 2-1/2 x 67-3/4" (1,5 x 6,3 x 172,1 cm) 3/4" (1,9 cm) x11 Bagged separately / special coating ¸1 BEGIN Install TJB flush to lower window trim and flush to front panels. Secure trim with 2" finish nails. Flush Flush TJB TJB Flush 2 Flush Center metal threshold between doors. Secure with (11) 3/4" special coating screws into floor.
DOOR TRACK PARTS REQUIRED: x8 1/8" BIT (3 mm) x2 ¸1 5/16" x 2" (8m x 5,1 cm) BEGIN 2 Install right door track first. Place right track brackets flush along top of lower window trim and flush to right corner trim. Mark bracket-hole locations on window trim. Pre-drill holes using a 1/8" drill bit. Secure track with (4) 2" lag screws through bracket and window trim into header (Fig. A). Slide left rail inside right track bracket flush to right track rail (Fig. B).
DOOR REINFORCEMENT PARTS REQUIRED: x60 x2 ¸1 BEGIN Reinforce doors by back-screwing through inside of door panel into trim. Use (30) 3/4" screws in each door, according to pattern shown. Space screws evenly.
DOOR HARDWARE PARTS REQUIRED: x2 ¸1 x8 Metal Rain Channel 3/4" (1,9 cm) 1" x 1" x 36" (2,5 x 2,5 x 91,4 cm) BEGIN Install 36" rain channel flush to end centered across upper corner of door. Secure with 3/4" screws spaced evenly (approx. 8"). Install rain channel flush to front of door.
DOOR HARDWARE PARTS REQUIRED: x2 36" (91,4 cm) Door Brush ¸1 x14 #8 X 3/4" (1,9 cm) Self-Piercing Round Head Screws x2 36" (91,4 cm) Door Brush Channel BEGIN Assemble (2) 36" door brushes as shown: Slide door brush into channel (Fig. A). Crimp each end of channel (Fig. B). E IN SLID Fig. A * During assembly, if you encounter resistance while inserting brush, try inserting in the opposite end. You can also smooth out any burrs with a file or use a lubricant such as WD-40. Crimp at ends Fig.
DOOR TROLLEYS PARTS REQUIRED: x2 ¸1 x16 x4 BEGIN Install (2) rolling door trolleys to inside top of each door using screws supplied in rolling door hardware bag. Position as shown.
DOOR INSTALLATION PARTS REQUIRED: x2 BEGIN 1 Slide right and left door into track as shown (Fig. A). Fig. A NOTE: Install doors into track slowly to prevent damage to rain channel.
WEATHERSTRIP PARTS REQUIRED: Weatherstrip Roll x1 BEGIN 1 Peel adhesive backing from weatherstrip and install to inside of left door. Weatherstrip should be flush to bottom of over door trim and overhanging 1/2" past edge of door (Fig. A, Fig. B). Flush 1/2" (13 mm) Fig. A Fig.
DOOR STIFFENERS PARTS REQUIRED: x2 2 x14 2" (5,1 cm) OO 1-1/4" x 2-1/2" x 69" (3,2 x 6,3 x 175,3 cm) Center each OO vertically on the inside of door between the floor and door header (Fig. C) and flush to edge of door (Fig. D). From outside, secure OO with (7) 2" screws through trim into OO (Fig. D). Space screws evenly. Fig. C OO Install OO on left door over top of weatherstrip. INSIDE OF DOOR Fig.
DOOR HARDWARE PARTS REQUIRED: x4 2" (5,1 cm) ¸1 x6 x2 1-1/2" (3,8 cm) x1 1/8" BIT (3,0 mm) BEGIN 2 Install door handles centered on trim and to measurement shown. Secure handles to door with (4) 2" pan head screws (Fig. A). Pre-drill using a 1/8" drill bit. Refer to latch hardware packaging instructions for installation. Install latch on right door to measurement shown. Secure with 1-1/2" lag screws. Fig.
DOOR HARDWARE PARTS REQUIRED: ¸1 x2 x6 #12 2" (5,1 cm) BEGIN Flush the stay roller bracket up underneath the vertical door trim and flush against wall panel (fig. A). Roll the door all the way over the bracket. If the door does not hit the bracket, install bracket with 2" screws as shown in Fig. A. If the door hits the stay roller bracket, move the bracket slightly down until the door clears the bracket (Fig. B), then install the bracket (Fig. A). Fig. A Fig. C Fig.
DOOR HARDWARE PARTS REQUIRED: x4 x1 Door Stop ¸1 #8 3/4" (1,9 cm) BEGIN Install door stop centered on over door trim seam and flush to bottom of trim as shown. Secure with (4) 3/4" screws.
DOOR HARDWARE PARTS REQUIRED: x2 #8 X 3/4" (1,9 cm) Self-Piercing Round Head Screws 69-3/4" (177,2 cm) Door Brush Channel x2 ¸1 x20 69-3/4" (177,2 cm) Door Brush BEGIN Assemble (2) 69-3/4" door brushes as shown in STEP - 1, PAGE 59, Fig. A and Fig. B. 2 Install (2) 69-3/4" door brushes flush to over door trim and flush to inside of door (Fig. C). Secure with 3/4" self-drilling screws as shown. 3 Re-adjust stay rollers if necessary. Fig.
DOOR HARDWARE PARTS REQUIRED: x4 x1 1-1/4 (3,2 cm) Spring Bolt ¸1 3/8" BIT (2,5 cm) BEGIN Center spring bolt to inside left door vertical stiffener OO. Flush bottom of spring bolt to bottom of OO (Fig. A). Secure with (4) 1-1/4" screws (Fig. B). Fig. A OO CENTER Flush Spring Bolt Fig. B Mark pin location 2 With door closed to the center stop, mark center location of spring bolt pin on metal threshold (Fig. C). Fig.
VENTS PARTS REQUIRED: x2 ¸1 x12 1/2" (1,3 cm) 8 x 16" (20,3 x 35,6 cm) BEGIN Locate and mark for two vents in both side walls as shown. (1) at top and (1) at bottom Cut out marked openings. Caulk behind vent flanges. 2 Secure with 1/2" screws. 4" (10,1 cm) 6" (15,2 cm) Caulk 14" (35,6 cm) 14" (35,6 cm) 4" (10,1 cm) Caulk 6" (15,2 cm) 3 – 5" (7,6 – 12,7 cm) FINISH Your vents are now installed.
PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges Note: Prime all un-primed exterior wood before painting.
DRIP EDGE PARTS REQUIRED: 3 x24 1" (2,5 cm) Install side drip edge flush along roof panels. Flush ends to trim (Fig. A). Secure with 1" roofing nails spaced 6" apart. Only nail top of drip edge. Roof Felt Drip Edge Drip Edge OVERLAP Install lower Drip Edge first Fig. A 16" TYP. (40,6 cm) 1" Roofing Nails Install lower Drip Edge first You must install drip edge to validate warranty. FINISH Your roof is now ready to shingle.
SHINGLES - NOT INCLUDED • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch SHINGLE NAIL PATTERN 1/2" (1,3cm) 1" (2,5cm) Sealing Str ip Notch 1" (2,5cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. ¸1 BEGIN Install first starter row upside down, color up and flush to drip edge at bottom of roof panel. Use (4) nails per shingle.
SHINGLES continued... 3 Install second row of shingles flush at top of first row's rain slots. Ensure flush to drip edge at front side, stagger each row. DOOR Notch BACK OF SHED Flush with rain slots. 4 Continue installing rows of shingles by staggering at front. Flush with rain slots. 1" (2,5 cm) Notch BACK OF SHED 5 Continue installing rows of shingles to the front of the shed. At the front edge of the shed make sure there is a maximum of 5" or less to the rain slot, as shown below.
SHINGLES - DRIP EDGE 7 Install drip edge over top shingle row with 1" overhang over roof edge. 1" (2,5 cm) 8 Using your shingle hooked blade carefully cut shingles on a flat surface along the rain slots, using a chalk line for reference. 9 Align remaining shingles with edge of the front drip edge. FINISH You have finished shingling your roof.
16916-W 12' x 8' Order Form CATEGORY PART DESCRIPTION PART SIZE PART ITEM # BUILDING QTY. PART ID LUM SPF 2 X 3 X 72 #2&BTR 2 X 3 X 31 15/16" 12.5* O/E 2 X 3 X 10-7/16" 12.5* L/S EAVE EXTENSION LUM SPF 2X3X96 #2&BTR 2 X 3 X 59-1/4" BACK WALL FILL Q 72000000000 Q 31151300000 Q 10071313000 12115 Q 59040000000 2 2 11 1 1 OY RMA QVA PT GKA 2 X 4 X 68" STUD LUM SPF 2X4X96 #2&BTR 2X4X48" DOUBLER/ PLATE/ CRATE 2 X 4 X 78-1/16" 12.5* O/E STUD 2 X 4 X 82-1/2" 12.5* O/E STUD 2 X 4 X 86-15/16" 12.
LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: 1. Every product is warranted from defects in workmanship and manufacturing for 1 year. 2. All accessories, hardware and metal components are warranted for 2 years. 3. All Oriented Strand Board (OSB) is warranted for 2 years 4. Siding and Trim is warranted for 15 years. 5. LP Prostruct® Flooring is warranted for 10 years 6. Cedar lumber is warranted for 15 years. 7. Preserved Pine is warranted for 10 years. 8.