Instructions / Assembly
3/8" x 48" x 84"
(1 x 121,9 x 213,4 cm)
x1
3/8" x 42" x 96"
(1 x 106,7 x 243,8 cm)
x1
31
PARTS REQUIRED:
SIDE WALL PANELS
x1
1-1/2" (3,8 cm)
3/8" x 42" x 96"
(1 x 106,7 x 243,8 cm)
x1
3/8" x 48" x 84"
(1 x 121,9 x 213,4 cm)
x1
x2
2" (5,1 cm)
1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm)
x1
OO
Place 42" x 96" front panel on temporary brace OO and ush with front wall stud (Fig. B).
Secure panel with (2) 2" nails in the bottom corners (Fig. A). Angle nails to hit oor frame (Fig. C).
Center and attach OO as a temporary support. Measure down from oor 1" and mark.
Secure to oor joist using (2) 3" screws.
Push the front and/or back wall until front and side wall panels are ush along the corner (Fig. B, Fig. D).
Secure upper corner with (1) 1-1/2" nail into rafter.
3
2
1
1-1/2" Nail
1"
(2,5 cm)
BEGIN
Fig. A
42"
(106,7 cm)
1"
(2,5 cm)
Flush
Flush
3" (7,6 cm)
x2
1" (2,5 cm) 1" (2,5 cm)
TEMPORARY SUPPORT
3" Screws
LEVEL
OO Floor Joist
OO
Fig. B
Fig. C
Primed
side out
Flush at
corner
PUSH
Fig. D
2" Nails
2" (5,1 cm
Nail










