Instructions / Assembly

3
COMPLETING YOUR SHED
You will need these additional materials:
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
1" GALVANIZED ROOFING NAILS....1/4 Lb
For roong felt.
DRIP EDGE ...................................... 50 Feet #15 ROOFING FELT
To cover 134 Sq. Ft. of roof area.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR
INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................. 5 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 2 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 3 Lbs
For shingles.
PAINT FOR TRIM .......................... 2 Quarts
Use 100% acrylic latex exterior paint.
CAULK .............................................. 1 Tube
For windows and door track
Use acrylic latex exterior caulk that is paintable.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT! The included oor has been designed for general use. Depending on your specic use you may want to construct a
heavy duty oor frame by adding additional oor joists (shown below). Below is a list of additional materials (not included):
x3
x12
2 x 4 x 87" (5 x 10 x 221 cm) Treated Lumber
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
TO VALIDATE YOUR WARRANTY YOU MUST USE THE FOLLOWING:
• This shed kit includes a complete wood oor system.
• This shed kit does not include ANY leveling materials.
See the FLOOR LEVELING section on page 8 for recommended methods and suggested materials to properly level your

Optional 12" (30,1 cm) spacing.
• Standard spacing is 16" (40,7 cm).