Instructions / Assembly
3
COMPLETING YOUR SHED
You will need these additional materials:
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
1" GALVANIZED ROOFING NAILS....1/4 Lb
For roong felt.
DRIP EDGE ...................................... 50 Feet #15 ROOFING FELT
To cover 134 Sq. Ft. of roof area.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR
INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................. 5 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 2 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 3 Lbs
For shingles.
PAINT FOR TRIM .......................... 2 Quarts
Use 100% acrylic latex exterior paint.
CAULK .............................................. 1 Tube
For windows and door track
Use acrylic latex exterior caulk that is paintable.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT! The included oor has been designed for general use. Depending on your specic use you may want to construct a
heavy duty oor frame by adding additional oor joists (shown below). Below is a list of additional materials (not included):
x3
x12
2 x 4 x 87" (5 x 10 x 221 cm) Treated Lumber
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
TO VALIDATE YOUR WARRANTY YOU MUST USE THE FOLLOWING:
• This shed kit includes a complete wood oor system.
• This shed kit does not include ANY leveling materials.
• See the FLOOR LEVELING section on page 8 for recommended methods and suggested materials to properly level your
Optional 12" (30,1 cm) spacing.
• Standard spacing is 16" (40,7 cm).