Instructions / Assembly

69
FINISH
Your door hardware is now installed.
Center spring bolt to inside left door vertical stiffener OO.
Flush bottom of spring bolt to bottom of OO (Fig. A). Secure with (4) 1-1/4" screws (Fig. B).
With door closed to the center stop, mark center location of
spring bolt pin on metal threshold (Fig. C).
Raise spring bolt pin and slide door open.
Pre drill metal threshold at mark using a 3/16" bit.
Re-drill hole using a 3/8" bit. Drill at least 1-1/2" deep into oor (Fig. C).
DOOR HARDWARE
x1
Spring
Bolt
3/8" BIT
(2,5 cm)
PARTS REQUIRED:
OO
Spring
Bolt
3
2
x4
1-1/4 (3,2 cm)
Fig. A
CENTER
Fig. C
3/8"
(1,0 cm)
Fig. B
(4) 1-1/4" (3,2 cm)
Screws
Mark pin location
BEGIN
¸
1
Flush
Drill
at least
1-1/2" (3,8 cm)