Instructions / Assembly
73
• Follow directions provided by manufacturer and these instructions.
SHINGLES
- NOT INCLUDED -
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
Familiarize yourself with a 3-Tab Shingle.
SHINGLE NAIL PATTERN
1"
(2,5 cm)
NAILS
Sealing Strip
1"
(2,5 cm)
1/2"
(1,3 cm)
Full Rain Slot
Half A Rain Slot
Notch
Notch
Install rst starter row upside down, color up and ush to drip edge at bottom of roof panel. Use (4) nails per shingle.
Starter row must be straight and level all the way across with lower edge of roof deck.
Begin where indicated on image below, install rst row of shingles with notch ush with drip edge.
2
2
Drip Edge
Notch
BACK OF SHED
START HERE
BACK OF SHED
TABS UP
BEGIN
Shingle overlaps
roof decking.
(4) Nails
Flush to drip edge.
Flush with starter row.
1" (2,5 cm)
Flush to drip edge.
DOOR
DOOR
BEGIN
¸
1










