Installation Guide

9
A
B
C
4"
(10,2 cm)
3-1/2"
(8,9 cm)
DOOR
CONCRETE FOUNDATION
If you choose to install your kit on a concrete slab refer to the diagram below.
•Atreated2x4(5,1x10,2cm)sillplateisrequiredwheninstallingyourshedonconcrete.
Hint:Usetreatedlumberinyourkitorpurchasefulllengthtreatedlumber.
•Useahighqualityexteriorgradecaulkbeneathallsillplates.
•Fasten2x4(5,1x10,2cm)sillplatestoslabusingapprovedconcreteanchors(fastenersnotincluded).
•Checklocalcodeforconcretefoundationrequirements.
NOTES
Allow new concrete slabs to cure for at least seven (7) days.
2 x 4 x 10' (5,1 x 10,2 x 304,8 cm)
2 x 4 x 8' (5,1 x 10,2 x 243,8 cm)
Caulk
Requires:
x2
x2
x1
MUSTbetreatedlumber.
MUSTbetreatedlumber.
Treated Sill Plate
Caulkbetweensill
plateandconcrete.
A B CActualFloorSizeBuildingSize
96"(243,8cm)
120"(305cm)
10'(295,9x235cm)
8'x10'(243,8x304,8cm)
113"(287cm)