Installation Guide

30
TEMPORARY SUPPORT
x1
2 x 4 x 21" (5,1 x 10,2 x 53,3 cm)
SBA
PARTSREQUIRED:
RAFTERS
FINISH
Your rafters are now assembled.
Flip rafter assembly over and repeat STEP 3 to attach second gusset to other side.
Repeat STEPS 2 - 3 to build 3 additional rafter assemblies.
Secure gusset to rafters with (12) 2" nails as shown.
SET ASIDE TWO RAFTER ASSEMBLIES WITH ONLY ONE GUSSET ATTACHED.
3
2
x120
2" (5,1 cm)
Gusset
1/4"(6,3 mm)
GAP
1/4"(6,3 mm)
GAP
2"(5,1cm)
Nails
(12)perside
Center
x10
6 x 24" (15,2 x 61 cm)
OSBORWOODGRAIN
x12
2x4x54-1/16"(5,1x10,2x137,3cm)
WI
1
2ndRafter2ndRafter
BACKWALL
WI
SBA
TEMPORARY
SUPPORT
WI
Flushatpeak
Placetworafterhalvesushincornersof2ndstudsfrombackwallandushtosidewallpanels.
Place temporary support SBA beneath rafters at peak.
YouwillbuildSixassemblies.(4)withtwogussets,and(2)withonegusset.
96"
(243,8 cm)
FlushFlush