Installation Guide

36
FRONT GABLE UNIT INSTALLATION
PARTSREQUIRED:
x2
3" (7,6 cm)
FINISH
Your front gable unit is now installed.
2
Working inside, secure gable unit connector CLA with (2) 3" screws into header at an angle (Fig.A).
1
NAIL FIRST
1-1/2"
(3,8 cm)
1-3/8"(3,5 cm)
Measureand
Mark
1-3/8"(3,5 cm)
Measureand
Mark
6"
(15,2 cm)
Fig.A
3" (7,6 cm)
Screws
CLA
3
NAIL FIRST
1-1/2"
(3,8 cm)
Front Gable Unit
x40
1-1/2"(3,8cm)
Secuerloweredgeofpanelstotopplateandheaderwith1-1/2"nailsspaced6"apart.
Securepanelstorafterwith1-1/2"nailsspaced6"apart.
Measure1-3/8"downfromtopplateandmarkateachsideasshown.Setgableunitonwallheader.
Securewith(1)1-1/2"nailoneachside.
ENSUREGABLEISCENTEREDONWALLBEFORENAILING.