Installation Guide

46
7/16"(11 mm)
Pre-drilledholes
7/16"(11 mm)
Pre-drilledholes
PARTSREQUIRED:
DOOR INSTALLATION
3" (7,6 cm)
x4
2
Temporarily install DBAat3/8"belowbottomofwallpanels(Fig.A).
Use (1) 3/8x1-3/4x71-1/2"trimasa3/8"spacerbetweenthewallpanelsadDBA.
Secure DBAtooorframewith(4)3"deckscrews,usingthefourpre-drilledholes.
Removethe3/8"spacerafterDBA is secure.
Hold DBAinplace,centeredoverdooropeningandushalongtheupperedgeoftopplate.
Pre-drillfourevenlyspaced7/16"screwholesthroughDBA into header.
Mark center of door opening on top plate - this mark will be used later.
Do not install DBA at this time. DBA will be used to support the doors during installation,
and will be installed after doors are installed. You will use the same pre-drilled holes.
3" (7,6 cm)
Screws
1
x1
3/8x1-3/4x71-1/2"(1x4,4x181,6cm)
Temporary Spacer
7/16"BIT
(11 mm)
DBA
Fig.A
3/8"(1,0 cm)
3" (7,6 cm)DeckScrews
Temporary
Spacer
TOP PLATE
HEADER
DBA
CENTER CENTER
Markcenter
Flush Flush
DBA
x1
2x4x72-3/8"(5,1x10,2x182,9cm)PVC
Temporary Support
Temporary
Spacer
DBA