Installation Guide

53
FINISH
Your gable vent, collar ties and door threshold are now installed.
x1
GABLE VENT, COLLAR TIES and DOOR THRESHOLD
PARTSREQUIRED:
1
Caulkbehindventanges.
Install vent in front gable.
Secure with 1" screws.
x4
1" (2,5 cm)
Fig.B
(11)SpecialCoatingScrews
3
Install metal threshold (Fig.B).
2
x1
63-7/8"MetalThreshold
3/4"(1,9cm)x11
Baggedseparately/specialcoating
Install collar tie to the rafter with (3) 2" nails at each end (Fig.A).
Starting at the wall with the door,
install (4) collar ties GUA on the four center rafters, as
shown.
HINT:
For best appearance, install collar
ties on back side of rafter, facing
away from door.
Fig.A
Flushtoroof
panel
2" (5,1 cm)
Nails
2" (5,1 cm)
x24
x4
1 x 4 x 60" (2,5 x 10,2 x 152,4 cm)
GUA