6828-GNP Call Us First! DO NOT RETURN TO STORE. For questions on assembly or for general inquiries, you may contact us in the following ways: Call customer service: 1-877-743-3400 AVOID THE WAIT! visit us online at help.backyardproducts.com Submit a help request Answers to frequently asked questions Live chat with an agent Did you enjoy building your shed? WANTE JOIN OUR TEAM AND MAKE UP TO $1,500/WEEK* h pl y si tb er ack all t s ya r din .
(This page intentionally left blank.
16828-GNP 07-08-2021 Backyard Products, LLC 1000 Ternes Drive Monroe, MI 48162 GARDEN SHED 6' x 8' (182,9 x 243,8 cm) ACTUAL FLOOR SIZE IS 72 x 96" (182,9 x 243,8 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE Building 6' x 8' (182,9 x 243,8 cm) IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY. BEFORE YOU BEGIN • BUILDING RESTRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for specific restrictions and/or requirements before building.
TOOLS Optional Required ❑ Phillips ❑ Tool Belt/ ❑ Utility Knife Screwdriver Nail Pouch ❑ Shingle Blades ❑ Drill / Driver ❑ 1/8" Drill Bit ❑ 1/4" Drill Bit ❑ 5/16" Drill Bit ❑ 1/2" Drill Bit ❑ #2 Philips Drive Bit ❑ Caulk Gun ❑ Tin Snips (for drip edge) ❑ Paint Tools ❑ Chalk Line ❑ Safety Glasses ❑ Hammer ❑ Nail Gun ❑ Level • gun nails ❑ Hand Saw ❑ Pencil ❑ Ladder ❑ Tape Measure ❑ Square ❑ Gloves or Safety! Always use approved safety glasses during assembly.
ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed includes a floor. • See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. REINFORCED WOOD FLOOR FRAME (OPTIONAL) IMPORTANT! This floor has been designed for general use. Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists (shown below as shaded).
PARTS IDENTIFICATION AND SIZES Part identification letters are stamped on some parts. RS WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 2 x 4 ..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) RS 1 x 4 .................3/4" x 3-1/2" (1,9 x 8,9 cm) Check these locations for part stamp. 2 x 3 ..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1 x 3 .................3/4" x 2-1/2" (3,8 x 6,3 cm) PARTS LIST WALLS INVENTORY YOUR PARTS before you begin.
PANEL PARTS LIST WALL PANELS & DOORS NOTE: Panel parts are not stamped. Wall panels panels are 3/8" (1,1 cm) thick. x1 x5 22-1/4 x 35-1/2" (56,5 x 90,2 cm) x4 3/8 x 48 x 72" (1 x 121,9 x 182,9 cm) 3/8 x 11-7/8 x 72" (1 x 30,2 x 182,9 cm) x1 22-1/4 x 35-1/2" (56,5 x 90,2 cm) x1 LEFT DOOR x1 22-1/4 x 35-1/2" (56,5 x 90,2 cm) x1 22-1/4 x 35-1/2" (56,5 x 90,2 cm) x1 RIGHT DOOR FLOOR PANELS NOTE: Panel parts are not stamped. Floor panels are 5/8" (1,6 cm) thick.
PARTS LIST continued... METAL ROOFING x2 x2 Ridge Cap Metal Roof Panel 4" x 4" x 54" (10,2 x 10,2 x 137,2 cm) Metal Gable Drip Edge 3" x 95-1/2" (7,6 x 217,2 cm) x20 Closure Strip x10 24" (61 cm) 25-5/8" x 46-3/4" (65,1 x 118,7 cm) NAIL BOXES x2 LBS. x3 LBS. 3" (7,6 cm) 2" (5,1 cm) FASTENERS / HARDWARE BAG x78 x86 2" (5,1 cm) x8 NOTE: 3-1/2" (8,9 cm) If you are using a nail gun, nails 3" (7,6 cm) may be used where screws are shown for quicker assembly.
FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS 4x4 Runners (not included) 8" (20,3 cm) Measurements to centers of 4x4's. 8" (20,3 cm) MATERIAL REQUIRED • 3" Screw angled into 4x4. • (2) at each point frame and 4x4 touch. x2 4 x 4 x 8' (10,1 x 10,1 x 243,8 cm) Treated Lumber Fasteners for Frame to 4x4. (3" Screws shown as one option.
CONCRETE FOUNDATION If you choose to install your kit on a concrete slab, refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete. C B A R DOO Building Size 6' x 8' (183 x 243,8 cm) Actual Size A 6' x 8' (182,9 x 243,8 cm) 72" (182,9 cm) B 65" (165,1 cm) C 96" (243,8 cm) Use treated lumber supplied in kit. x2 2 x 4 x 8' (5 x 10 x 243,8 cm) MUST be treated lumber. x2 2 x 4 x 6' (5 x 10 x 182,9 cm) Cut to (2) 2 x 4 x 65" MUST be treated lumber.
FLOOR FRAME PARTS REQUIRED: x2 x7 x28 3" (7,6 cm) x28 TREATED 2 x 4 x 96" (5 x 10 x 244 cm) NOTE: Look for TREATED 2 x 4 x 69" (5 x 10 x 175,3 cm) Stamp. BEGIN 1 Orient parts as shown on flat surface. Measure and mark each dimension from end of boards. Secure using two 3" nails at each mark. HINT: For easier nailing stand on frame.
LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN 1 See page 7 for the preferred floor leveling method. 2 Use level and check the frame is level before applying floor panels. 3 Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square.
FLOOR PANELS PARTS REQUIRED: x53 2" (5,1 cm) x1 5/8 x 48 x 96" (1,6 x 121,9 x 243,8 cm) Install panels with rough side up (painted grid lines). BEGIN 1 Attach the 48 x 96" panel with the 48" edge and corner flush to the outside of the floor frame. Secure panel using using 2" nails 6" apart on edges and 12" apart inside panel.
FLOOR PANELS PARTS REQUIRED: x35 x1 5/8 x 23-7/8 x 96" (1,6 x 60,6 x 243,8 cm) 5 Attach the 23-7/8 x 96" panel with the 96" edge flush to the installed panel. Secure panel using using 2" nails 6" apart on edges and 12" apart inside panel. DOOR Grid lines up Flush 12" (30,5 cm) 23-7/8 x 96" 60,6 x 243,8 cm) 6" (15,2 cm) FINISH Your floor panels are now installed.
IMPORTANT! Check that the floor frame is level after installing floor panels. Re-level if needed. • The floor should be used as a stable work surface for wall construction. HINT: • Organize your assembly procedure during the build process to avoid over-handling of the walls.
SIDE WALLS PARTS REQUIRED: x40 3" (7,6 cm) x10 UM 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) x4 TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) - BUILD TWO IDENTICAL SIDE WALLS - BEGIN 1 HINT: For easier nailing stand on frame. Orient parts on edge on floor. Measure and mark. Use two 3" nails at each mark.
SIDE WALLS PARTS REQUIRED: 48 x 72" (121,9 x 182,9 cm) x2 2 x180 2" (5,1 cm) 3/4" GAUGE BLOCK Install 48 x 72" wall panels with primed side up as shown. Secure panels to frame using 2" nails 6" apart along edges and 12" apart on inside of panel. Flush BEGIN HERE 3/4" (1,9 cm) For squareness maintain flush and 3/4" measurement along panel edges.
BACK WALL PARTS REQUIRED: x5 x20 UM 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) x2 TJA 2 x 4 x 65" (5,1 x 10,2 x 165,1 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark. Use two 3" nails at each mark. HINT: For easier nailing stand on frame.
BACK WALL PARTS REQUIRED: x2 x101 2" (5,1 cm) 3/4" GAUGE BLOCK 48 x 72" (121,9 x 182,9 cm) x1 2 11-7/8 x 72" (30,2 x 182,9 cm) Install back wall panels with primed side up as shown. Secure panels to frame using 2" nails 6" apart along edges and 12" apart on inside of panel. Flush 3/4" (1,9 cm) BEGIN HERE For squareness maintain flush and 3/4" measurement along panel edges.
BACK WALL PARTS REQUIRED: x5 x1 XL 3 1-1/2" (3,8 cm) 1 x 3 x 64" (2,5 x 7,6 x 162,5 cm) Center XL on back wall flush to the edge of wall top plate and wall panels (Fig. A, B). Secure nailer using (5) 1-1/2" nails spaced evenly. Fig. B Flush XL Fig. A XL 1-1/2" (3,8 cm) Nails Wall Panel Front wall panel CENTER CENTER FINISH You have finished building your back wall. Carefully flip the back wall over.
FRONT WALL PARTS REQUIRED: x2 CPA x16 2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm) x1 TJA 3" (7,6 cm) 2 x 4 x 65" (5,1 x 10,2 x 165,1 cm) x4 UM 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark. Use two 3" nails at each mark. HINT: For easier nailing stand on frame.
FRONT WALL PARTS REQUIRED: x2 2" (5,1 cm) 11-7/8 x 72 (30,2 x 182,9 cm) x2 x1 OO 2 x56 3" (7,6 cm) Door Stiffener 69" (175,3 cm) TEMPORARY SUPPORT Place 11-7/8" x 72" panels primed side up onto wall frame flush to top and along edges as shown. Secure panels with 2" nails 6" apart. 3 Attach temporary support OO to frame as shown using 3" screws.
FRONT WALL PARTS REQUIRED: x5 x1 XL 4 1-1/2" (3,8 cm) 1 x 3 x 64" (2,5 x 7,6 x 162,5 cm) Center XL on back wall flush to the edge of wall top plate and wall panels (Fig. A, B). Secure nailer using (5) 1-1/2" nails spaced evenly. XL Fig. B XL 1-1/2" (3,8 cm) Nails Fig. A Wall Panel Front wall panel CENTER CENTER FINISH You have finished building your front wall. Carefully flip the front wall over.
RIGHT WALL INSTALLATION PARTS REQUIRED: x8 3" (7,6 cm) x2 3" (7,6 cm) x18 2" (5,1 cm) BEGIN 1 Center right side wall assembly on the 96" floor dimension. 2 Use TP as a temporary brace. Secure with (2) 3" screws. Panel Flush TP (24 9 6 3, 8 " cm ) D O O R 3" (7,6 cm) Screws 3 Nail lower edge of panel to floor frame using 2" nails 6" apart. Angle nail to hit floor frame (Fig. A). Secure wall bottom plates to floor using 3" nails (Fig. A). 3" (7,6 cm) Nails Nail 2" nails first.
BACK WALL INSTALLATION PARTS REQUIRED: x15 x2 2" (5,1 cm) 2" (5,1 cm) BEGIN 1 Center back wall assembly on the 72" dimension of floor. D O R 2 O (18 72 " 2, 9 cm ) Secure back wall to side walls using one 2" screw into side wall top and bottom plate (Fig. A). ENSURE TOP OF WALL FRAMES ARE FLUSH. Flush Flush Fig. A 2" (5,1 cm) Screw 2" (5,1 cm) Screw Flush 2" (5,1 cm) Screw 6" (15,2 cm) 2" (5,1 cm) Nails Fig. B 2" (5,1 cm) Nail 3 Angle nail to hit floor frame.
BACK WALL INSTALLATION PARTS REQUIRED: x11 x6 4 x1 1-1/2" (3,8 cm) 3" (7,6 cm) 3" (7,6 cm) Nail back wall panel to side wall stud using 1-1/2" nails 6" apart (Fig. C). Secure back wall top plate using (1) 3" screw into side wall top plate at an angle (Fig. D). Secure back wall to floor using 3" nails (Fig. C). 3" (7,6 cm) Screw Fig. D 1-1/2" (3,8 cm) Nails Fig. C 6" (15,2 cm) 3" (7,6 cm) Nails FINISH Your back wall is now installed.
LEFT WALL INSTALLATION PARTS REQUIRED: x2 2" (5,1 cm) x18 2" (5,1 cm) Panel Flush BEGIN Center left side wall assembly on the 96" floor dimension. 2 Secure back wall to side wall using one 2" screw into side wall top and bottom plate (Fig. A). D 1 O O R ENSURE TOP OF WALL FRAMES ARE FLUSH. Flush Flush Fig. A 2" (3,8 cm) Screw 2" (5,1 cm) Screw 2" (5,1 cm) Nails Flush 6" (15,2 cm) Fig. B 2" (5,1 cm) Screw 3 Angle nail to hit floor frame.
LEFT WALL INSTALLATION PARTS REQUIRED: x11 x8 4 x1 1-1/2" (3,8 cm) 3" (7,6 cm) 3" (7,6 cm) Nail back wall panel to side wall stud using 1-1/2" nails 6" apart (Fig. C). Secure back wall top plate using (1) 3" screw into side wall top plate at an angle (Fig. D). Secure side wall to floor using 3" nails (Fig. C). 3" (7,6 cm) Screw Fig. D 1-1/2" (3,8 cm) Nails 6" (15,2 cm) 3" Nails into bottom plate FINISH Your left side wall is now installed.
FRONT WALL INSTALLATION PARTS REQUIRED: x4 2" (5,1 cm) x4 2" (5,1 cm) BEGIN 1 Remove temporary wall support. Center front wall assembly between the side walls. 2 Secure front wall to side walls using one 2" screw into top and bottom plates (Fig. A). ENSURE TOP OF WALL FRAMES ARE FLUSH. Flush Fig. A Flush 2" (3,8 cm) Screw 2" (5,1 cm) Screw Flush Flush 2" (5,1 cm) Screw 2" (5,1 cm) Screw Flush 6" (15,2 cm) 2" (5,1 cm) Nail 2" (5,1 cm) Screw Fig. B Angle nail to hit floor frame.
FRONT WALL INSTALLATION PARTS REQUIRED: x22 x2 4 x2 1-1/2" (3,8 cm) 3" (7,6 cm) 3" (7,6 cm) Nail front wall panel to side wall studs using 1-1/2" nails 6" apart (Fig. C). Secure front wall top plates using (2) 3" screws into side wall top plates at an angle (Fig. D). Secure front wall to floor using 3" nails (Fig. C). Remove temporary brace. 3" (7,6 cm) Screw Fig. D 1-1/2" (3,8 cm) Nails 6" (15,2 cm) Fig. C 3" (7,6 cm) Nails FINISH Your front wall is now installed.
SQUARING THE WALLS PARTS REQUIRED: x1 2x4 x1 2x4 You must square the walls after they are standing. The 120" dimension is taken from the outside of the framing (Fig. A). A square shed means you will have a straight and professional looking roof. ALL WALLS MUST BE: THE FINAL DIMENSIONS WILL BE EQUAL: - LEVEL - CORNER TO CORNER - PLUMB - SQUARE Wall Panel 120" (304,8 cm) Measurements taken from here Fig.
FRONT WALL GABLE PARTS REQUIRED: x1 x8 x2 SFA x1 2 x 3 x 4-7/8" (5,1 x 7,6 x 12,4 cm) BEGIN 1 Orient parts SFA on flat as shown. 2 Place LEFT front gable panel as shown. Secure using 1-1/2" nails as shown 1-1/4" (3,2 cm) 1-1/2" (3,8 cm) Nails SFA Flush SFA 3/4" (1,9 cm) 1-1/4" (3,2 cm) Primed side up 3 Place RIGHT front gable panel flush to left panel. Secure using 1-1/2" nails. 1-1/2" (3,8 cm) Nails Flush Flush FINISH You have finished assembling your front wall gable.
BACK WALL GABLE PARTS REQUIRED: x1 x6 x1 LN x1 2 x 3 x 16-1/2" (5,1 x 7,6 x 41,9 cm) BEGIN 1 Orient part LN on flat as shown. 2 Place LEFT back gable panel as shown. Secure using 1-1/2" nails as shown 1-1/4" (3,2 cm) 1-1/2" (3,8 cm) Nails LN 3/4" (1,9 cm) 1-1/4" (3,2 cm) Primed side up 3 Place RIGHT back gable panel flush to left panel. Secure using 1-1/2" nails. 1-1/2" (3,8 cm) Nails Flush Flush FINISH You have finished assembling your back wall gable.
FRONT GABLE PARTS REQUIRED: x2 3" (7,6 cm) x12 2" (5,1 cm) Front Gable Unit BEGIN 1 Center front gable unit on front wall gable nailer. Secure gable unit with 2” nails evenly spaced. Gable Nailer 2" (5,1 cm) Nails 2 SPACED EVENLY Working inside, secure gable unit with 3" screws toe-screwed into nailer and top plate at an angle. 3" (7,6 cm) Screws FINISH Your front gable is now installed.
BACK GABLE PARTS REQUIRED: x2 3" (7,6 cm) x12 2" (5,1 cm) Back Gable Unit BEGIN 1 Center back gable unit on back wall gable nailer. Secure gable unit with 2” nails evenly spaced. Gable Nailer 2" (5,1 cm) Nails 2 SPACED EVENLY Working inside, secure gable unit with 3" screws toe-screwed into nailer and top plate at an angle. 3" (7,6 cm) Screws FINISH Your back gable is now installed.
SOFFIT TRIM PARTS REQUIRED: x4 x16 3" (7,6 cm) JEB 2 x 3-3/16" x 49-1/2" (5,1 x 8,1 x 125,7 cm) BEGIN 1 Install soffit trim JEB as shown (Fig. A). Flush JEB along top of side wall panels. Secure using 3" screws into top plate (Fig. B). 3" (7,6 cm) Screws 1-1/2" (3,8 cm) JEB x4 DO OR 12" (30,5 cm) Flush 1-1/2" (3,8 cm) 3" (7,6 cm) Screw Fig. B Fig. A Screw must go into top plate FINISH Your soffit trim is now installed.
FRONT GABLE TRIM FILLER PARTS REQUIRED: x2 x10 IUA 1-1/4" (3,2 cm) 2 x 3 x 42-5/8" (5,1 x 7,6 x 108,3 cm) BEGIN 1 Working from inside of gable, secure trim fillers IUA using 1-1/4" screws spaced evenly as shown. Flush at peak IUA Flush IUA Front Gable Flush Flush FINISH Your front gable trim filler is now installed.
BACK GABLE TRIM FILLER PARTS REQUIRED: x2 x10 DTA 1" (2,5 cm) 1 x 3 x 42-5/8" (2,5 x 7,6 x 108,3 cm) BEGIN 1 Working from inside of gable, secure trim fillers DTA using 1" screws spaced evenly as shown. Flush at peak DTA DTA Flush Back Gable Flush Flush FINISH Your back gable trim filler is now installed.
ROOF PURLINS PARTS REQUIRED: x8 x4 TP 3-1/2" (8,9 cm) x8 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) 3" (7,6 cm) BEGIN 1 Align TP using notches in the gable panel for position (Fig. A). 2 Secure TP from outside using 3" screws at back gable and using 3-1/2" screws at front gable. Fig. A CENTER Flush TP x4 3" (7,6 cm) Screws TP x4 3-1/2" (8,9 cm) Screws Flush FINISH Your roof joists are now installed.
CORNER TRIM PARTS REQUIRED: x4 x2 x2 ¸1 x48 3/8 x 1-3/4 x 68-13/16" (1 x 4,4 x 174,8 cm) 3/8 x 1-3/4 x 70-1/16" (1 x 4,4 x 178 cm) 3/8 x 1-3/4 x 70-1/16" (1 x 4,4 x 178 cm) BEGIN Attach corner trim as shown using 2" finish nails. 70-1/16" (178 cm) LEFT or RIGHT on gable walls 68-13/16" (174,8 cm) on eave walls Flush under gable filler and soffit 68-13/16" (174,8 cm) 70-1/16" (178 cm) Seam is flush. Caulk seam before painting trim. FINISH Your corner trim is now installed.
HORIZONTAL GABLE TRIM PARTS REQUIRED: x2 x14 2" (5,1 cm) KFC 19/32" x 2-1/2" x 63-13/16" (1,5 x 6,3 x 162,1 cm) ¸1 BEGIN Attach horizontal gable trim KFC to front and back gable as shown. Nail into gable nailer using 2" finish nails spaced evenly. Flush KFC Flush Gable Nailer FRONT Flush KFC Flush Gable Nailer BACK FINISH Your horizontal gable trim is now installed.
FRONT GABLE TRIM PARTS REQUIRED: x2 x2 ¸1 x10 WCR 2" (5,1 cm) 19/32 x 3-1/2 x 47" (1,5 x 8,9 x 119,4 cm) WCL 19/32 x 3-1/2 x 47" (1,5 x 8,9 x 119,4 cm) BEGIN Position WCL and WCR flush with top of front gable panels and filler. Nail into gable filler and soffit trim using 2" finish nails spaced evenly as shown. Flush at peak Flush WCR WCL Flush FINISH Your front gable trim is now installed.
BACK GABLE TRIM PARTS REQUIRED: x2 x2 ¸1 x6 2" (5,1 cm) WCR 19/32 x 3-1/2 x 47" (1,5 x 8,9 x 119,4 cm) x8 WCL 1-1/2" (3,8 cm) 19/32 x 3-1/2 x 47" (1,5 x 8,9 x 119,4 cm) BEGIN Position WCL and WCR flush with top of back gable panel and filler. Nail into gable filler and soffit trim using 2" finish nails spaced evenly as shown. Flush at peak Flush WCR WCL Flush 2 Working from inside of shed reinforce trim using 1-1/2" screws (Fig. A). Fig.
METAL ROOF PANELS PARTS REQUIRED: x3 ¸1 1-1/2" (3,8 cm) Metal Roof Panel 25-5/8" x 46-3/4" (65,1 x 118,7 cm) x1 BEGIN Fig. B Using (2) clamps, tightly clamp a string or chalkline to front and back gable trim. Position string flush to top corner edge of gable trim (Fig. A, Fig. B). Clamp string here Fig. A Flush string to corner Clamp String Flush string to top corner Fro nt Clamp String 2 Mark each center line dimension shown on top of gable trim.
METAL ROOF PANELS PARTS REQUIRED: x3 1-1/2" (3,8 cm) Metal Roof Panel 25-5/8" x 46-3/4" (65,1 x 118,7 cm) x1 Install roof panel with 3 overlapping contour waves covering the prevoiusly installed panel. Fig. D Panel Valley Panel Peak 1 2 3 Panel Contour Waves 3 Position 2nd panel overlapping the first panel by 3 panel contour waves (Fig. D) and flush to string. Secure panel to trim JEB and roof joists TP using (3) 1-1/2" screws in panel valley nearest edge.
METAL ROOF PANELS PARTS REQUIRED: x12 1-1/2" (3,8 cm) Metal Roof Panel 25-5/8" x 46-3/4" (65,1 x 118,7 cm) x3 4 Install three more metal roof panels as in STEP - 3, overlapping all panels by 3 panel contour waves. Install (3) screws in each panel valley nearest edge. Install (6) screws in last panel, as shown.
METAL ROOF PANELS PARTS REQUIRED: x10 5 x18 Closure Strip 24" (61 cm) 1-1/2" (3,8 cm) Temporarily back-out the lower (6) screws from metal panels and eave trim (Fig. F). Beginning at the front panel, tuck (5) foam enclosures in between roof panels and eave trim. The 4th and 5th foam enclosure will overlap at the back panel. Reinstall screws. Remove and re-insert screws Fig. F Fro nt 6 Install (5) roof panels on opposite side of roof following STEPS 1 - 5, beginning at the front gable.
METAL ROOF PANELS - SCREW PATTERN PARTS REQUIRED: ¸1 x60 BEGIN x16 1-1/2" (3,8 cm) 7/8" (22 cm) Measure and mark screw type and locations shown in this view. Use this pattern for all panels.
METAL RIDGE CAP PARTS REQUIRED: x2 x12 x10 Closure Strip 24" (61 cm) Ridge Cap 4" x 4" x 54" (10,2 x 10,2 x 137,2 cm) ¸1 7/8" (2,2 cm) BEGIN Install 1st ridge cap flush to front of roof panels across the peak of the roof. Foam enclosures go in-between the metal roof and the bottom edge of the ridge cap as shown. Secure using (4) 7/8" screws 1/2" from edge of ridge cap (Fig A). Install screws in second peak from end of ridge cap (Fig B). Flush Fig. B 2nd peak from end Fig.
METAL DRIP EDGE PARTS REQUIRED: x12 Metal Drip Edge x2 3" x 95-1/2" (7,0 x 217,2 cm) ¸1 7/8" (2,2 cm) BEGIN 2 Measure and mark center of drip edge. Using a framing square scribe a 31.5* line from your center point, cut the line. 31.5o STOP HERE 31.5o CENTER 3 CENTER Place drip edge centered at peak of gable. Fold down at center cut over peak of gable. Position vertical edge of drip edge flush to gable trim. Secure using (3) 7/8" screws per side and as shown as shown in FIg. A.
DOORS PARTS REQUIRED: x1 x4 3" (7,6 cm) OO x2 Door Stiffener 69" (175,3 cm) x1 GAA 1-1/4" (3,2 cm) 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) x1 x1 Left Door Assembled Right Door Assembled 1 Orient parts as shown on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board. 2 Attach temporary support OO using (4) 3" screws in middle and at ends as shown. 3 Attach temporary support GAA using (2) 1-1/4" screws as shown.
DOORS PARTS REQUIRED: x1 x12 3" (7,6 cm) OO Door Stiffener 69" (175,3 cm) 4 Attach temporary support OO as a ledger board flush under wall panels for doors to rest on. Measure down 72" from over-door trim and secure OO using (2) 3" screws (Fig. A). Fig. A OO 72" (182,9 cm) OO 5 Center doors on panel seam as shown (Fig. B). Screw hinge boards into wall supports and floor using ten 3" screws as shown (Fig. C). 6 Remove temporary supports and check that the doors open properly. SEAM Fig. B Fig.
DOOR TRIM PARTS REQUIRED: x8 x4 EGB 19/32 x 2-1/2 x 18-5/8" (1,5 x 6,3 x 47,3 cm) x1 x56 3/4" (1,9 cm) Bagged separately / special coating 3/4" (1,9 cm) 48" Metal Threshold BEGIN 1 2 Install (4) horizontal door rails EGB as shown. Secure using (4) 3/4" screws from behind. Reinforce door trim from inside using 3/4" screws as shown (Fig. A, Fig. B). Door Panel 3/4" (1,9 cm) Screws from behind. Fig. A Door Trim Install EGB flush to bottom of window opening.
DOOR TRANSOM WINDOWS PARTS REQUIRED: x2 x8 Transom Window ¸1 3/4" (1,9 cm) BEGIN Apply high quality exterior-grade caulk behind frame near edge before installing to seal window. You must caulk completely around window frame and all exposed door panel edges and trim to validate your warranty. Use a paintable exterior rated caulk. FRONT SIDE VIEW 2 From back side of door, measure 11-13/16" from inside edge of door. Mark center of window opening on door.
DOOR STIFFENERS PARTS REQUIRED: x2 x12 2" (5,1 cm) OO Door Stiffener 69" (175,3 cm) BEGIN 1 Center OO vertically on the left door in the door opening flush with the edge of door (Fig. A). 2 Secure using (7) 3" screws through outside trim into OO (Fig. B) 3 Repeat STEPS 1 - 2 to install OO on right door. OO x2 Fig. B IT IS IMPORTANT TO HOLD THESE DIMENSIONS Center OO in door opening. Fig.
DOOR SPRING BOLTS PARTS REQUIRED: x2 x8 5/16" (0,8 cm) Drill Bit 3/4" (1,9 cm) BEGIN Place bolt onto OO in open position with bolt end 3/8" down from frame. Bolt is open when loop is contacting base (Fig A). 1 Mark and pre-drill holes for screws. 2 Install bolt with screws supplied and drill 5/16" hole for bolt to extend into. 3 Place bolt onto OO in open position with bolt end 1/2" up from floor. Bolt is open when loop is contacting base (Fig B). Mark and pre-drill holes for screws.
DOOR HARDWARE / DECORATIVE HINGES PARTS REQUIRED: x1 x2 x4 1-1/2" (3,8 cm) 1/2" (1,3 cm) Drill Bit x12 3/4" (1,9 cm) 1/4" (0,6 cm) Drill Bit BEGIN 1 Measure and mark location of hole on outside of right door as shown (Fig. A). Pre-drill hole with 1/4" drill. Re-drill hole with 1/2" drill. Keep drilled hole square to trim to avoid breaking edge of Door Stiffener. Flush to hinge RIGHT DOOR. 1-3/4" (3,8 cm) TOP VIEW 35-3/4" 90 cm 1-3/4" 3,8 cm Fig.
SHELVING PARTS REQUIRED: x18 x6 QOA x6 2 x 3 x 6-1/2" (5,1 x 7,6 x 16,5 cm) x18 1-1/4" (3,2 cm) 1-1/2" (3,8 cm) 3/8 x 9 x 10" (1 x 22,9 x 25,4 cm) BEGIN 1 Assemble 6 shelf supports as shown; 4 right-side, 2 left-side. Secure QOA to bracket panels using (3) 1-1/2" nails. x2 x4 Flush 1-1/2" (3,8 cm) Nail QOA Flush 2 Install shelf supports at shown height using (3) 1-1/4" screws in each.
SHELVING PARTS REQUIRED: x12 x2 7/16 x 7-7/8 x 72" (1,1 x 20 x 182,9 cm) 3 1-1/4" (3,2 cm) x12 2" (5,1 cm) x2 HJ 1 x 3 x 72" (2,5 x 7,6 x 182,9 cm) Install shelf panels centered over shelf supports. Secure using 1-1/4" screws at each support. 1-1/4" (3,2 cm) Screws 72" (182,9 cm) Flush Flush 72" (182,9 cm) Flush 4 Center under shelf panels HJ. Secure using 2" nails at each shelf support as shown. HJ 2" (5,1 cm Nails HJ Flush FINISH Your shelves are now installed.
GABLE VENT PARTS REQUIRED: x1 ¸1 BEGIN 2 Apply high quality exterior-grade caulk behind frame near edge before installing to seal vent. From outside of shed, position vent in opening and level. Caulk behind flange near edge before installing. FINISH Your gable vent is now installed.
LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: 1. Every product is warranted from defects in workmanship and manufacturing for 1 year. 2. All accessories, hardware and metal components are warranted for 2 years. 3. All Oriented Strand Board (OSB) is warranted for 2 years 4. Siding and Trim is warranted for 15 years. 5. LP Prostruct® Flooring is warranted for 10 years 6. Cedar lumber is warranted for 15 years. 7. Preserved Pine is warranted for 10 years. 8.