Installation Guide

41
Flush
at peak
2
BACK GABLE TRIM
PARTS REQUIRED:
x6
2" (5,1 cm)
BEGIN
¸
1
FINISH
Position WCL and WCR ush with top of back gable panel and ller.
Nail into gable ller and soft trim using 2" nish nails spaced evenly as shown.
Working from inside of shed reinforce trim using 1-1/2" screws (Fig. A).
Your back gable trim is now installed.
Flush
Flush
x2
19/32 x 3-1/2 x 47" (1,5 x 8,9 x 119,4 cm)
WCL
x2
19/32 x 3-1/2 x 47" (1,5 x 8,9 x 119,4 cm)
WCR
Gable Filler
1-1/2" Screws from
behind
(at four locations)
WCL
WCL
WCR
WCR
Fig. A
Back Gable
2" (5,1 cm)
Finish Nails
x6
x8
1-1/2" (3,8 cm)