Installation Guide
47
2
METAL RIDGE CAP
PARTS REQUIRED:
Install 1st ridge cap ush to front of roof panels across the peak of the roof.
Foam enclosures go in-between the metal roof and the bottom edge of the ridge cap as shown.
Secure using (4) 7/8" screws 1/2" from edge of ridge cap (Fig A).
Install screws in second peak from end of ridge cap (Fig B).
Install 2nd ridge cap ush to back of roof panels, across the peak of the roof and overlapping
the installed ridge cap.
Install foam encolsures as in STEP - 1 using (8) 7/8" screws. The last foam enclosure on each end
will overlap the previous enclosures. Install screws in second peak from end of ridge cap (Fig B).
BEGIN
¸
1
Ridge Cap
4" x 4" x 54" (10,2 x 10,2 x 137,2 cm)
x2
x12
7/8" (2,2 cm)
Closure Strip 24" (61 cm)
x10
Flush
Flush
Fig. A
Closure
Strip
Ridge Cap
7/8" (2,2 cm)
Screw
FINISH
Your ridge cap are now installed.
Fig. B
Fig. B
2nd peak
from end
2nd peak
from end
1/2"
(1,3 cm)
1/2"
(1,3 cm)
From edge of ridge cap