6490-NG PART 1 STOP! Call Us First! DO NOT RETURN TO STORE. For questions on assembly or for general inquiries, you may contact us in the following ways: Call customer service: 1-877-743-3400 AVOID THE WAIT! visit us online at help.backyardproducts.
Win $500 A new winner is selected every 2 months. Review your product for the chance to win a $500 Visa Gift Card. How to Enter: Open camera. Aim. Tap. et or Scan QR code above. Click ‘write a review’ Find your product. Tell us what you think. s .n it v is ba ckyardr ew evi Submit your review. You’ll be notified by e-mail if you’ve won the $500 gift card. Write a Backyard Products, LLC. product review at backyardreviews.net for a chance to win a $500 Visa gift card.
16490-NG ASSEMBLY MANUAL GABLE 12' x 12' (365,8 x 365,8 cm) BASE MODEL +1: 12' x 4' Extender +1: 12' x 8' Extender +1: 12' x 8' and +1: 12' x 4' Extender BUILDING SIZE 12' x 12' (365,8 x 365,8 cm) 12' x 16' (365,8 x 487,7 cm) 12' x 20' (365,8 x 609,6 cm) 12' x 24' (365,8 x 731,5 cm) 06/06/2022 PART 1 ACTUAL FLOOR SIZE 12' x 12' (365,8 x 365,8 cm) 12' x 16' (365,8 x 487,7 cm) 12' x 20' (365,8 x 609,6 cm) 12' x 24' (365,8 x 731,5 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE Base Building +1 Extender 12' x
TOOLS Required ❑ Phillips Screwdriver Optional ❑ Tool Belt/ Nail Pouch ❑ Utility Knife ❑ Shingle Blades ❑ Drill / Driver ❑ 3/8" Drill Bit ❑ #2 Philips Drive Bit ❑ Tin Snips (for drip edge) ❑ Caulk Gun ❑ Hammer ❑ Chalk Line ❑ Paint Tools ❑ Level ❑ Nail Gun ❑ Pencil ❑ Safety Glasses ❑ Tape Measure ❑ Ladder ❑ Square • gun nails ❑ Gloves or ❑ Sawsall Safety! Always use approved safety glasses during assembly.
ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • If you purchased a separate floor kit, use instructions and materials in that kit to construct your floor. • See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site.
ADDITIONAL MATERIALS COMPLETING YOUR SHED You will need these additional materials: 12x12' 12x16' 12x20' 12x24' 3-TAB SHINGLES (Bundles)......... 7 9 11 13 PAINT FOR SIDING (Gallons)....... 3 3 4 4 Use 100% acrylic latex exterior paint. (2) coats recommended. 1" galvanized roofing nails (lbs). 12x12' 12x16' 12x20' 12x24' Paint for trim/Quart Use 100% acrylic latex exterior paint. 2 2 3 3 Caulk Tubes ........... 4 5 6 7 Use acrylic paintable latex exterior caulk.
PARTS IDENTIFICATION AND SIZES Double letter part identification is stamped on some parts. WOOD SIZE CONVERSION CHART RS RS Nominal Board Size RS Actual Size 2 x 4 ..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1 x 4 .................3/4" x 3-1/2" (1,9 x 8,9 cm) • Check these locations for part stamp. 2 x 3 ..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1 x 3 .................3/4" x 2-1/2" (3,8 x 6,3 cm) 12x12' GABLE 12' x 12' PARTS LIST INVENTORY YOUR PARTS before you begin.
PANEL & DOORS PARTS LIST NOTE: Panel parts are not stamped with part identification. x9 x2 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) x1 x1 x1 3/8 x 23-7/8 x 84" (1 x 60,6 x 213,4 cm) x2 x2 x1 x2 ROOF PANELS Roof panels are 7/16" (1,1 cm) thick.
DOOR TRIM x2 AH x2 MDR 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) x2 MDL 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) x2 OO x1 ZJ 19/32" x 2-1/2" x 26-5/8" (1,5 x 6,3 x 67,7 cm) 69" (175,3 cm) Door Stiffener 19/32" x 2-1/2" x 72" (1,5 x 6,3 x 182,9 cm) DOOR HARDWARE x1 x2 1" (2,5 cm) x2 1-1/4" (3,2 cm) x2 x8 3/4" (1,9 cm) x2 NAIL BOXES (Shown Actual Size) x6 BOXES x6 BOXES 3" (7,6 cm) 2" (5,1 cm) 7
GABLE EXTENDER KIT PARTS LIST Inventory your parts before you begin. We suggest sorting parts by the category they are listed in. WOOD SIZE CONVERSION CHART Part identification is stamped on some parts. Nominal Board Size Actual Size 2 x 4 ..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1 x 4 .................3/4" x 3-1/2" (1,9 x 8,9 cm) RS RS 2 x 3 ..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1 x 3 .................3/4" x 2-1/2" (3,8 x 6,3 cm) • Check these locations for part stamp.
CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below. Attach the sill plates on the foundaton as shown, and continue on to page 14. Treated Sill Plate Caulk between sill plate and concrete. D D D D C C 3-1/2" (8,9 cm) B B A A 4" (10,2 cm) Sill plates must be treated lumber.
OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS (Typical for 12' x 12' Kit) Measurements to centers of 4x4's. 12" (30,5 cm) • 3" Screws angled into 4x4. • (2) at each point frame and 4x4 touch. Runners are generally 12" (30,5 cm) from ends of floor frame and under seams.
LEVELING & SQUARING THE FLOOR FRAME (Not Included) LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. See page 10 for the preferred floor leveling method. Use a level and ensure the frame is level before applying floor panels. BEGIN 1 Check for frame squareness by measuring diagonally across the corners (diagonal measurement D).
IMPORTANT! I M P O R TA N T ! NOTE: 12' x 12' Gable shown standard throughout manual DO O R Ensure the floor frame is level after installing floor panels. Re-level if needed. • The floor should used as a stable work surface for wall construction. HINT: • Organize your assembly procedure during the build process to avoid over-handling of the walls.
(This page intentionally left blank.
WALL CONFIGURATION GUIDE Create your own style of shed. Choose your door location. Compare this guide with the wall index to find the corresponding pages.
WALL INDEX As another option, eave walls with doors can be reversed during assembly. CUT HERE 12' x 12' 12' x 16' 12' x 20' CUT HERE 12' x 24' After assembling the walls for your 12' x 12' shed, go to page 56 for wall installation. 12' x 12' 12' x 12' V-1 12' x 12' V-2 Door is on the 12' gable wall. Wall 01: Page 18 Wall 02: Page 20 Wall 04: Page 24 (build 2 walls 04) Door is on the 12' eave wall, centered.
DOOR HEADER Assemble this door header before building any walls! PARTS REQUIRED: x2 x18 3" (7,6 cm) AM 2 x 4 x 67" (5,1 x 10,2 x 170,2 cm) x1 7/16 x 3-1/4 x 66-3/4" (1,1 x 8,3 x 170,2 cm) OSB BEGIN 1 Place (1) AM and OSB end-to-end on flat surface, flush in middle. Center OSB on top of AM. Fasten together with 3" nails in the pattern shown. 2 ASSEMBLED END VIEW Flip header assembly over and nail as shown on the other side. AM Flush OSB AM Flush FINISH Your door header is now assembled.
WALL PANEL INSTALLATION HINTS & EXAMPLES PARTS REQUIRED: x40 2" (5,1 cm) GAA 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm ) x1 3/4" GAUGE BLOCK Ensure your wall is square by installing one panel and squaring frame. BEGIN 1 2 Install all wall panels with the primed side facing up. Place a 48" x 84" panel on the wall frame, as shown. Locate the panel flush to the top plate. Use the gauge block to mark the 3/4" side measurement on the wall stud. Secure panel with (2) 2" nails in the corners (Fig. A).
GABLE WALL 01 WITH DOOR PARTS REQUIRED: x2 x5 AL x72 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) SP 3" (7,6 cm) x6 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 3" (7,6 cm) AI x6 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x2 TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) Pre Assembled Header x2 UM x1 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards. Orient Pre Assembled Header as shown (Fig. A).
GABLE WALL 01 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x166 x2 23-7/8 x 84" (60,6 x 213,4 cm) 3 4 x1 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges.
12' GABLE WALL 02 PARTS REQUIRED: x2 x32 3" (7,6 cm) SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x7 AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x2 TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards. Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
12' GABLE WALL 02 PARTS REQUIRED: x150 48 x 84" (121,9 x 213,4 cm ) x3 2 2" (5,1 cm) 1-1/2" (3,8 cm) Install 48" x 84" panel 1-1/2" from the top plate. 2x3 3/4" (1,9 cm) BEGIN HERE Use a 2x3 spacer for consistent measurement. 6" (15,2 cm) Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. 12" (30,5 cm) 3/4" Gauge Block Flush 1-1/2" (3,8 cm) Flush 3 Install (2) 48" x 84" panels flush to installed panels. Locate panels 1-1/2" from the top plate.
12' GABLE WALL 03 PARTS REQUIRED: x2 x32 3" (7,6 cm) SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x7 AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x2 TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards. Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
12' GABLE WALL 03 PARTS REQUIRED: x142 2" (5,1 cm) x2 23-7/8 x 84" (60,6 x 213,4 cm) 48 x 84" (121,9 x 213,4 cm ) x2 1-1/2" (3,8 cm) 2 2x3 3/4" (1,9 cm) Install 48" x 84" panel 1-1/2" from the top plate. BEGIN HERE Use a 2x3 spacer for consistent measurement. 6" (15,2 cm) Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel.
12' EAVE WALL 04 PARTS REQUIRED: x1 x24 3" (7,6 cm) HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x2 YFA x1 x5 TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark from end of boards. HINT: Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
12' EAVE WALL 04 PARTS REQUIRED: x120 48 x 84" (121,9 x 213,4 cm ) x3 2 Install 48" x 84" panel 1-1/2" from the top plate. 2" (5,1 cm) 2x3 3/4" (1,9 cm) BEGIN HERE 1-1/2" (3,8 cm) Use a 2x3 spacer for consistent measurement. 6" (15,2 cm) Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. 12" (30,5 cm) 3/4" Gauge Block 3 3-1/2" (8,9 cm) 1-1/2" (3,8 cm) Flush Flush 2x3 Install next (2) 48" x 84" panels flush to installed panel.
12' EAVE WALL 05 WITH DOOR PARTS REQUIRED: x64 YFA x2 AI x4 3" (7,6 cm) x5 AL 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x1 3" (7,6 cm) x6 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) HVC x1 TJ 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) Pre Assembled Header x2 UM x1 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards.
12' EAVE WALL 05 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x136 x2 23-7/8 x 84" (60,6 x 213,4 cm) 3 4 x1 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. x1 x1 OO Temporary Brace 69" (75,3 cm) Door Stiffener Flush 3/4" (1,9 cm) 3/4" Gauge Block 3/4" Gauge Block Install the right panel flush to installed panel, as shown. Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace.
12' EAVE WALL 06 WITH DOOR PARTS REQUIRED: x64 YFA x2 AI x4 3" (7,6 cm) x5 AL 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x1 3" (7,6 cm) x6 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) x1 TJ HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) Pre Assembled Header x2 UM x1 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards.
12' EAVE WALL 06 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x129 x1 3 4 48 x 84" (121,9 x 213,4 cm ) x1 x1 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. x1 OO Temporary Brace 69" (75,3 cm) Door Stiffener Flush 3/4" (1,9 cm) Install the right panel flush to installed panel, as shown. Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace. Secure with (2) 3" screws.
16' EAVE WALL 07 PARTS REQUIRED: x36 HVC x1 x7 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 3" (7,6 cm) AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x2 SP x1 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) YFA x2 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) BEGIN Orient parts on edge on floor. Measure and mark from end of boards. 1 HINT: Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
16' EAVE WALL 07 PARTS REQUIRED: x170 2" (5,1 cm) x4 48 x 84" (121,9 x 213,4 cm ) 2 Install (1) 48" x 84" panel 1-1/2" from the top plate. 2x3 1-1/2" (3,8 cm) 3/4" (1,9 cm) BEGIN HERE Use a 2x3 spacer for consistent measurement. 6" (15,2 cm) Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. 12" (30,5 cm) 3/4" Gauge Block 3/4" Gauge Block 3 Install (3) 48" x 84" panels flush to installed panels. 1-1/2" (3,8 cm) Locate panels 1-1/2" from the top plate.
16' EAVE WALL 08 PARTS REQUIRED: x36 HVC x1 x7 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 3" (7,6 cm) AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x2 SP x1 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) YFA x2 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) BEGIN Orient parts on edge on floor. Measure and mark from end of boards. 1 HINT: Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
16' EAVE WALL 08 PARTS REQUIRED: x192 2" (5,1 cm) x2 23-7/8 x 84" (60,6 x 213,4 cm) x3 48 x 84" (121,9 x 213,4 cm ) 2 Install (1) 48" x 84" panel 1-1/2" from the top plate. 2x3 1-1/2" (3,8 cm) 3/4" (1,9 cm) BEGIN HERE Use a 2x3 spacer for consistent measurement. 6" (15,2 cm) Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. 12" (30,5 cm) 3/4" Gauge Block 3/4" Gauge Block 3 Install (2) 48" x 84" and (2) 23-7/8" x 84" panels flush to installed panels.
16' EAVE WALL 09 WITH DOOR PARTS REQUIRED: x76 x5 AL x2 3" (7,6 cm) x6 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 3" (7,6 cm) SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x2 x1 HVC x1 UM 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) YFA AI x6 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) Pre Assembled Header x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 Orient parts on edge on floor as shown.
16' EAVE WALL 09 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x164 x2 48 x 84" (121,9 x 213,4 cm ) x1 x1 x1 2" (5,1 cm) OO Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. 3/4" (1,9 cm) BEGIN HERE Flush 1-1/2" (3,8 cm) 2x3 4 6" (15,2 cm) Install the right panel flush to installed panel, as shown. Ensure 64" (162,8 cm) door measurement.
16' EAVE WALL 10 WITH DOOR PARTS REQUIRED: x74 x5 AL x1 3" (7,6 cm) x6 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 3" (7,6 cm) SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x2 x1 UM YFA x2 HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) x6 AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) Pre Assembled Header x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards.
16' EAVE WALL 10 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x186 x2 x1 23-7/8 x 84" (60,6 x 213,4 cm) 48 x 84" (121,9 x 213,4 cm ) x1 OO x1 x1 2" (5,1 cm) Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. 3/4" (1,9 cm) BEGIN HERE Flush 1-1/2" (3,8 cm) 2x3 4 6" (15,2 cm) Install the right panel flush to installed panel, as shown.
16' EAVE WALL 11 WITH DOOR PARTS REQUIRED: x76 x5 AL x6 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) x2 3" (7,6 cm) 3" (7,6 cm) SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x2 HVC x1 UM 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) YFA x2 AI x6 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) Pre Assembled Header x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 Orient parts on edge on floor as shown.
16' EAVE WALL 11 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x179 x2 48 x 84" (121,9 x 213,4 cm ) x1 OO x1 x1 2" (5,1 cm) Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. 3/4" (1,9 cm) Install the right panel flush to installed panel, as shown. Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace. Secure with (2) 3" screws.
20' EAVE WALL 12 PARTS REQUIRED: x44 YFA x2 3" (7,6 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) x9 AI x1 x1 HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x2 TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark from end of boards. HINT: Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
20' EAVE WALL 12 PARTS REQUIRED: x220 2" (5,1 cm) x5 2 48 x 84" (121,9 x 213,4 cm ) Install (1) 48" x 84" panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. 2x3 1-1/2" (3,8 cm) 3/4" (1,9 cm) BEGIN HERE 6" (15,2 cm) 12" (30,5 cm) 3/4" Gauge Block 3 3/4" Gauge Block Install (4) 48" x 84" panels flush to installed panels. Locate panels 1-1/2" from the top plate.
20' EAVE WALL 13 WITH DOOR PARTS REQUIRED: x88 x5 AL x2 3" (7,6 cm) x6 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 3" (7,6 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) x2 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) YFA x2 HVC x1 UM 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) AI x8 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) Pre Assembled Header x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 Orient parts on edge on floor as shown.
20' EAVE WALL 13 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x2 x2 x236 23-7/8 x 84" (60,6 x 213,4 cm) 48 x 84" (121,9 x 213,4 cm ) x1 OO x1 x1 2" (5,1 cm) Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. 4 Install the right panel flush to installed panel, as shown.Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace.
20' EAVE WALL 14 WITH DOOR PARTS REQUIRED: x86 x5 AL x2 3" (7,6 cm) x6 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 3" (7,6 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) x2 x1 UM YFA x2 HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) x8 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) Pre Assembled Header x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 Orient parts on edge on floor as shown.
20' EAVE WALL 14 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x214 x3 48 x 84" (121,9 x 213,4 cm ) x1 OO x1 x1 2" (5,1 cm) Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. 4 Install the right panel flush to installed panel, as shown.Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace. Secure with (2) 3" screws.
20' EAVE WALL 15 WITH DOOR PARTS REQUIRED: x84 x5 AL x2 3" (7,6 cm) x6 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 3" (7,6 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) x2 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) YFA x2 HVC x1 UM 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) AI x8 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) Pre Assembled Header x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 Orient parts on edge on floor as shown.
20' EAVE WALL 15 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x2 x1 x236 23-7/8 x 84" (60,6 x 213,4 cm) 48 x 84" (121,9 x 213,4 cm ) x1 OO x1 x1 2" (5,1 cm) Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. 4 Install the right panel flush to installed panel, as shown.Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace.
24' EAVE WALL 16 PARTS REQUIRED: x56 3" (7,6 cm) YFA x2 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) x11 AI x1 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x2 TJ SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x2 HVC x1 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark from end of boards. Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
24' EAVE WALL 16 PARTS REQUIRED: x270 2" (5,1 cm) x6 2 48 x 84" (121,9 x 213,4 cm ) Install (1) 48" x 84" panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. 2x3 3/4" (1,9 cm) 1-1/2" (3,8 cm) BEGIN HERE 6" (15,2 cm) 12" (30,5 cm) 3/4" Gauge Block 3 3/4" Gauge Block Install (5) 48" x 84" panels flush to installed panels. Locate panels 1-1/2" from the top plate.
24' EAVE WALL 17 WITH DOOR PARTS REQUIRED: 3" (7,6 cm) x6 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) x2 x96 HVC x1 x5 AL 3" (7,6 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) x2 x2 UM x2 SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) YFA x10 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) Pre Assembled Header x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 Orient parts on edge on floo
24' EAVE WALL 17 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x264 x4 48 x 84" (121,9 x 213,4 cm ) x1 OO x1 x1 2" (5,1 cm) Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. 4 Install the right panel flush to installed panel, as shown.Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace. Secure with (2) 3" screws.
24' EAVE WALL 18 WITH DOOR PARTS REQUIRED: x1 x5 AL 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) x2 x96 HVC 3" (7,6 cm) x6 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 3" (7,6 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) x2 x2 UM YFA x2 SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) AI x10 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) Pre Assembled Header x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 Orient parts on edge on floor
24' EAVE WALL 18 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x2 x3 x286 23-7/8 x 84" (60,6 x 213,4 cm) 48 x 84" (121,9 x 213,4 cm ) x1 OO x1 x1 2" (5,1 cm) Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. 4 Install the right panel flush to installed panel, as shown.Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace.
24' EAVE WALL 19 WITH DOOR PARTS REQUIRED: 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) x2 x102 HVC x1 x5 AL 3" (7,6 cm) x6 3" (7,6 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) x2 x2 UM YFA x2 SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) x10 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) Pre Assembled Header x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 Orient parts on edge on floor
24' EAVE WALL 19 WITH DOOR PARTS REQUIRED: x2 3" (7,6 cm) x264 x4 48 x 84" (121,9 x 213,4 cm ) x1 OO x1 x1 2" (5,1 cm) Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. 4 Install the right panel flush to installed panel, as shown.Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace. Secure with (2) 3" screws.
12' GABLE WALL 02 INSTALLATION PARTS REQUIRED: x1 x12 3" (7,6 cm) OO 69" (175,3 cm) Door Stiffener x2 3" (7,6 cm) x27 2" (5,1 cm) 1-1/2" (3,8 cm) BEGIN 1 Center 12' gable wall on the 144" (365,8 cm) floor dimension. 1-1/2" (3,8 cm) overlap is to the top. DO O R Use OO as a temporary brace. Secure with (2) 3" screws. 3" (7,6 cm) Screws OO Flush 2 Secure lower edge of panel to floor frame with 2" nails spaced 6" apart. Angle nails into floor frame (Fig. A).
12' EAVE WALL 04 INSTALLATION PARTS REQUIRED x1 x2 2" (5,1 cm) 3" (7,6 cm) x27 2" (5,1 cm) x13 1-1/2" (3,8 cm) x12 3" (7,6 cm) Fig. B BEGIN 1 Place 12' eave wall centered on floor. 1-1/2" (3,8 cm) overlap is to the top. 2" (5,1 cm) Screw Secure wall with (1) 2" screw into 12' gable wall bottom plate (Fig. A) and top plate (Fig. B). Flush Secure wall to bottom plate first. 1-1/2" (3,8 cm) ENSURE PANEL CORNERS ARE FLUSH. 2" (5,1 cm) Screw STANDARD: DOOR LOCATED ON 12' GABLE WALL Fig.
2nd 12' EAVE WALL 04 INSTALLATION PARTS REQUIRED: x2 x12 2" (5,1 cm) x27 2" (5,1 cm) x13 3" (7,6 cm) x1 3" (7,6 cm) 1-1/2" (3,8 cm) 1 Place 2nd 12' eave wall centered on floor 1-1/2" (3,8 cm) overlap is to the top. 2" (5,1 cm) Screw ENSURE PANEL CORNERS ARE FLUSH. 2 Secure wall with (1) 2" screw through eave wall panel into 12' gable wall bottom and top plates (Fig. B, Fig. A). Secure wall to bottom plate first. 3 Nail lower edge of wall panels to floor frame with 2" nails spaced 6" apart.
12' GABLE WALL 01 WITH DOOR INSTALLATION PARTS REQUIRED x2 x4 x16 2" (5,1 cm) x8 x26 3" (7,6 cm) 1-1/2" (3,8 cm) BEGIN 1 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) Screw Place 12' gable wall on floor, centered between installed walls. Fig. B Secure wall with 2" screws into top and bottom plates (Fig. A, Fig. B). Flush Secure wall to bottom plate first. ENSURE PANEL CORNERS ARE FLUSH. STANDARD: DOOR LOCATED ON 12' GABLE WALL Flush Fig.
12' x 12' WALL DOUBLERS INSTALLATION PARTS REQUIRED: x2 x2 SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x2 x64 HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 3" (7,6 cm) x8 3" (7,6 cm) TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x2 PT 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on top of wall frames. Measure and mark from end of boards. Secure from top with (2) 3" nails spaced every 24" (Fig. A). 2 Secure from bottom with (2) 3" screws at each corner (Fig. B).
12' GABLE WALL 02 INSTALLATION PARTS REQUIRED: x1 x12 3" (7,6 cm) OO 69" (175,3 cm) Door Stiffener x2 3" (7,6 cm) x27 2" (5,1 cm) 1-1/2" (3,8 cm) BEGIN 1 Center 12' wall on the 120" (304,8 cm) floor dimension. 1-1/2" (3,8 cm) overlap is to the top. DO O R Use OO as a temporary brace. Secure with (2) 3" screws. 3" (7,6 cm) Screws OO Flush 2 Secure lower edge of panel to floor frame with 2" nails spaced 6" apart. Angle nails into floor frame (Fig. A).
1st 16' EAVE WALL 07 INSTALLATION PARTS REQUIRED x3 x2 3" (7,6 cm) x1 TJ 2" (5,1 cm) x13 Temporary Brace 1-1/2" (3,8 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x36 x16 2" (5,1 cm) 3" (7,6 cm) Fig. B BEGIN 1 Place 1st 16' eave wall centered on floor. 1-1/2" (3,8 cm) The 1-1/2" (3,8 cm) overlap is to the top. Use TJ as a temporary brace as shown. Secure TJ with (2) 3" screws. 2" (5,1 cm) Screw Flush 3" (7,6 cm) Screws Secure wall with (1) 2" screw into 12' wall bottom plate (Fig.
2nd 16' EAVE WALL (07 or 08) INSTALLATION PARTS REQUIRED: x16 3" (7,6 cm) x2 x2 2" (5,1 cm) x1 TJ 3" (7,6 cm) Temporary Brace x36 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) 2" (5,1 cm) 1-1/2" (3,8 cm) BEGIN 1 3" (7,6 cm) Screws Place 2nd 16' wall centered on floor. The 1-1/2" (3,8 cm) overlap is to the top. 2" (5,1 cm) Screw Use TJ as a temporary brace as shown. Secure TJ with (2) 3" screws. Fig.
2nd 16' EAVE WALL (07 or 08) INSTALLATION PARTS REQUIRED: x13 1-1/2" (3,8 cm) x1 3" (7,6 cm) 3" (7,6 cm) Screw Fig. D 6" (15,2 cm) 4 Nail 16' wall panel to 12' wall stud with 1-1/2" nails spaced 6" apart. 1-1/2" (3,8 cm) Nails 5 Secure gable wall top plate with (1) 3" screw at the corner at an angle, as shown (Fig. D). FINISH Your 2nd 16' (07 or 08) wall is now installed.
12' GABLE WALL 01 WITH DOOR INSTALLATION PARTS REQUIRED x2 x4 x16 2" (5,1 cm) x8 x26 3" (7,6 cm) 1-1/2" (3,8 cm) BEGIN 1 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) Screw Place 12' gable wall on floor, centered between installed walls. Fig. B Secure wall with 2" screws into top and bottom plates (Fig. A, Fig. B). Flush Secure wall to bottom plate first. ENSURE PANEL CORNERS ARE FLUSH. STANDARD: DOOR LOCATED ON 12' GABLE WALL Flush Fig.
12' x 16' WALL DOUBLERS INSTALLATION PARTS REQUIRED: NK x4 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x2 x76 x2 HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 3" (7,6 cm) x8 3" (7,6 cm) TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x2 PT 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on top of wall frames. Measure and mark from end of boards. Secure from top with (2) 3" nails spaced every 24" (Fig. A). 2 Secure from bottom with (2) 3" screws at each corner (Fig. B).
12' GABLE WALL 02 INSTALLATION PARTS REQUIRED: x1 x12 3" (7,6 cm) OO 69" (175,3 cm) Door Stiffener x2 3" (7,6 cm) x27 2" (5,1 cm) 1-1/2" (3,8 cm) BEGIN 1 Center 12' wall on the 120" (304,8 cm) floor dimension. 1-1/2" (3,8 cm) overlap is to the top. DO O R Use OO as a temporary brace. Secure with (2) 3" screws. 3" (7,6 cm) Screws OO Flush 2 Secure lower edge of panel to floor frame with 2" nails spaced 6" apart. Angle nails into floor frame (Fig. A).
1st 20' EAVE WALL 12 INSTALLATION PARTS REQUIRED x3 x2 3" (7,6 cm) x1 TJ 2" (5,1 cm) x13 Temporary Brace 1-1/2" (3,8 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x45 x20 2" (5,1 cm) 3" (7,6 cm) Fig. B BEGIN 1 Place 1st 20' eave wall 12 centered on floor. The 1-1/2" (3,8 cm) overlap is to the top. Use TJ as a temporary brace as shown. Secure TJ with (2) 3" screws. 2" (5,1 cm) Screw Flush 1-1/2" (3,8 cm) Secure wall with (1) 2" screw into 12' wall bottom plate (Fig. A) and top plate (Fig. B).
2nd 20' EAVE WALL 12 INSTALLATION PARTS REQUIRED: x2 x2 3" (7,6 cm) x45 2" (5,1 cm) x1 TJ x20 2" (5,1 cm) 3" (7,6 cm) Temporary Brace 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 3" (7,6 cm) Screws Place 2nd 20' wall 12 centered on floor. 2" (5,1 cm) Screw 1-1/2" (3,8 cm) overlap is to the top. Fig. B Use TJ as a temporary brace as shown. Secure TJ with (2) 3" screws. TJ 1-1/2" (3,8 cm) 2 Secure wall with (1) 2" screw through gable wall panel into 12' wall bottom and top plates (Fig.
2nd 20' EAVE WALL 12 INSTALLATION PARTS REQUIRED: x1 3" (7,6 cm) x13 1-1/2" (3,8 cm) 4 Secure 20' wall panel to 12' wall stud with 1-1/2" nails spaced 6" apart. 3" (7,6 cm) Screw Fig. D 5 Secure wall top plate with (1) 3" screw at the corner at an angle as shown (Fig. D). 6" (15,2 cm) FINISH Your 2nd 20' wall 12 is now installed.
12' GABLE WALL WITH DOOR INSTALLATION PARTS REQUIRED x2 x4 x16 2" (5,1 cm) x8 x26 3" (7,6 cm) 1-1/2" (3,8 cm) BEGIN 1 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) Screw Place 12' gable wall on floor, centered between installed walls. Fig. B Secure wall with 2" screws into top and bottom plates (Fig. A, Fig. B). Flush Secure wall to bottom plate first. ENSURE PANEL CORNERS ARE FLUSH. Flush STANDARD: DOOR LOCATED ON 12' GABLE WALL Fig.
12' x 20' WALL DOUBLERS INSTALLATION PARTS REQUIRED: x2 x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x84 HVC x2 SP 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) TJ 3" (7,6 cm) x8 3" (7,6 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x4 PT 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on top of wall frames. Measure and mark from end of boards. Secure from top with (2) 3" nails spaced every 24" (Fig. A).
12' GABLE WALL 02 INSTALLATION PARTS REQUIRED: x1 x12 3" (7,6 cm) OO 69" (175,3 cm) Door Stiffener x2 3" (7,6 cm) x27 2" (5,1 cm) 1-1/2" (3,8 cm) BEGIN 1 Center 12' wall on the 120" (304,8 cm) floor dimension. 1-1/2" (3,8 cm) overlap is to the top. DO O R Use OO as a temporary brace. Secure with (2) 3" screws. 3" (7,6 cm) Screws OO Flush 2 Secure lower edge of panel to floor frame with 2" nails spaced 6" apart. Angle nails into floor frame (Fig. A).
1st 24' EAVE WALL 16 INSTALLATION PARTS REQUIRED x5 x2 3" (7,6 cm) x2 TJ 2" (5,1 cm) x13 Temporary Brace 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x54 x24 2" (5,1 cm) 1-1/2" (3,8 cm) 3" (7,6 cm) Fig. B BEGIN 1 Place 1st 24' eave wall 16 centered on floor. The 1-1/2" (3,8 cm) overlap is to the top. Use (2) TJ as a temporary brace, as shown. Secure TJ with (2) 3" screws. 2" (5,1 cm) Screw Flush Secure wall with (1) 2" screw into 12' wall bottom plate (Fig. A) and top plate (Fig. B).
2nd 24' EAVE WALL 16 INSTALLATION PARTS REQUIRED: 3" (7,6 cm) x54 x24 2" (5,1 cm) x2 x2 x4 TJ 2" (5,1 cm) 3" (7,6 cm) Temporary Brace 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 3" (7,6 cm) Screws Place 2nd 24' wall 16 centered on floor. The 1-1/2" (3,8 cm) overlap is to the top. 2" (5,1 cm) Screw Use TJ as a temporary brace as shown. Secure TJ with (2) 3" screws. Fig.
2nd 24' EAVE WALL 16 INSTALLATION PARTS REQUIRED: x1 3" (7,6 cm) x13 1-1/2" (3,8 cm) 4 Secure 24' wall panel to 12' wall stud with 1-1/2" nails spaced 6" apart. 3" (7,6 cm) Screw Fig. D 5 Secure wall top plate with (1) 3" screw at the corner at an angle as shown (Fig. D). 6" (15,2 cm) FINISH Your 2nd 24' wall 16 is now installed.
12' GABLE WALL 01 WITH DOOR INSTALLATION PARTS REQUIRED x2 x4 x16 2" (5,1 cm) x26 x8 1-1/2" (3,8 cm) 3" (7,6 cm) BEGIN 1 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) Screw Place 12' gable wall on floor, centered between installed walls. Fig. B Secure wall with 2" screws into top and bottom plates (Fig. A, Fig. B). Flush Secure wall to bottom plate first. ENSURE PANEL CORNERS ARE FLUSH. Flush Fig. A 2" (5,1 cm) Screw 2 Nail lower edge of panels to floor with 2" nails spaced 6" apart.
12' x 24' WALL DOUBLERS INSTALLATION PARTS REQUIRED: x4 x2 HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x84 SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x2 3" (7,6 cm) x8 3" (7,6 cm) TJ x4 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) PT 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) 44-3/8" (112,7 cm) BEGIN 92-5/8" (235,3 cm) 1 Orient parts on top of wall frames. Measure and mark from end of boards. Secure from top with (2) 3" nails spaced every 24" (Fig. A).
Please continue to the included booklet PART 2 to complete your shed.