Installation Guide

27
Install the left panel 1-1/2"
from the top plate.
Use a 2x3 spacer for
consistent measurement.
Secure panel with 2" nails
spaced 6" apart
on edges.
Install the right panel
ush to installed panel,
as shown.
Ensure 64" (162,8 cm)
door measurement.
Use part OO as a
temporary brace.
Secure with (2) 3"
screws.
Secure panels with 2"
nails spaced 6" apart
on edges.
2x3
2x3
PARTS REQUIRED:
12' EAVE WALL 05 WITH DOOR
2" (5,1 cm)
x136
x1 x1
6" (15,2 cm)
1-1/2"
(3,8 cm)
BEGIN HERE
3/4"
(1,9 cm)
Flush Flush
OO Temporary Brace
3" (7,6 cm)
x2
4
3
64"
(162,6 cm)
3" (7,6 cm)
Screw
3" (7,6 cm)
Screw
x1
69" (75,3 cm) Door Stiffener
OO Temporary Brace
Install (2) 11-7/8" x 84"
panels  ush to installed
panels and 1-1/2" from
the top plate.
Secure panels with 2"
nails spaced 6" apart
on edges.
Flush Flush
FlushFlush
5
Your 12' eave wall 05 with
door is now assembled.
Carefully  ip the wall over.
FINISH
23-7/8 x 84"
(60,6 x 213,4 cm)
x2
3/4"
(1,9 cm)
1-1/2"
(3,8 cm)
6" (15,2 cm)
3/4" Gauge
Block
3/4" Gauge
Block
Flush
23-7/8"
(60,6 cm)
3-1/2"
(8,9 cm)
3-1/2"
(8,9 cm)