47
12"
(30,5 cm)
Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement.
Secure panel with 2" nails spaced 6" apart on edges.
Install the right panel ush to installed panel, as shown.Ensure 64" (162,8 cm) door measurement.
Use part OO as a temporary brace. Secure with (2) 3" screws.
Secure panels with 2" nails spaced 6" apart on edges.
2x3
2x3
PARTS REQUIRED:
20' EAVE WALL 15 WITH DOOR
2" (5,1 cm)
x236
x1 x1
6" (15,2 cm)
1-1/2"
(3,8 cm)
BEGIN HERE
3/4"
(1,9 cm)
Flush Flush
OO Temporary Brace
3" (7,6 cm)
x2
4
3
64"
(162,6 cm)
3" (7,6 cm)
Screw
3" (7,6 cm)
Screw
x1
69" (75,3 cm) Door Stiffener
OO Temporary Brace
Install (3) 48" x 84" panel ush to installed panels and 1-1/2" from the top plate.
Secure with 2" nails spaced 6" apart on edges and 12" apart inside panel.
Flush Flush Flush
Flush
Flush FlushFlush
Flush
5
Your 20' eave wall 15 with door is now assembled.
Carefully ip the wall over.
FINISH
1-1/2"
(3,8 cm)
6" (15,2 cm)
3/4" Gauge
Block
3/4" Gauge
Block
Flush
3-1/2"
(8,9 cm)
48 x 84"
(121,9 x 213,4 cm )
x1
23-7/8 x 84"
(60,6 x 213,4 cm)
x2
3-1/2"
(8,9 cm)
23-7/8"
(60,6 cm)