Installation Guide

55
12"
(30,5 cm)
Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement.
Secure panel with 2" nails spaced 6" apart on edges.
Install the right panel  ush to installed panel, as shown.Ensure 64" (162,8 cm) door measurement.
Use part OO as a temporary brace. Secure with (2) 3" screws.
Secure panels with 2" nails spaced 6" apart on edges.
PARTS REQUIRED:
24' EAVE WALL 19 WITH DOOR
2" (5,1 cm)
x264
x1 x1
3" (7,6 cm)
x2
4
3
x1
69" (75,3 cm) Door Stiffener
OO Temporary Brace
Install (2) 48" x 84" panel  ush to installed panels and 1-1/2" from the top plate.
Secure with 2" nails spaced 6" apart on edges and 12" apart inside panel.
FlushFlush
Flush
Flush
Flush FlushFlush
Flush
5
Your 24' eave wall 19 with door is now assembled.
Carefully  ip the wall over.
FINISH
1-1/2"
(3,8 cm)
2x3
2x3
6" (15,2 cm)
6" (15,2 cm)
1-1/2"
(3,8 cm)
BEGIN HERE
3/4"
(1,9 cm)
Flush Flush
OO Temporary Brace
64"
(162,6 cm)
3" (7,6 cm)
Screw
3" (7,6 cm)
Screw
3/4" Gauge
Block
3/4" Gauge
Block
Flush
3-1/2"
(8,9 cm)
3-1/2"
(8,9 cm)
48 x 84"
(121,9 x 213,4 cm )
x4