Installation Guide
68
STANDARD:
DOOR LOCATED
ON 12' GABLE WALL
OPTIONAL:
DOOR LOCATED
ON 20' EAVE WALL
1st 20' EAVE WALL 12 INSTALLATION
3" (7,6 cm)
x3
3" (7,6 cm)
x20
2
Place 1st 20' eave wall 12 centered on oor.
The 1-1/2" (3,8 cm) overlap is to the top.
Use TJ as a temporary brace as shown.
Secure TJ with (2) 3" screws.
Secure wall with (1) 2" screw into 12' wall
bottom plate (Fig. A) and top plate (Fig. B).
Secure wall to bottom plate fi rst.
BEGIN
1
Nail lower edge of panels to oor
with 2" nails spaced 6" apart.
Angle nails into oor frame
(Fig. C).
Secure panel to 12' wall stud with
1-1/2" nails spaced 6" apart.
ENSURE PANEL CORNERS ARE FLUSH.
Your 1st 20' eave wall 12 is now installed.
FINISH
2" (5,1 cm)
x45
1-1/2" (3,8 cm)
x13
2" (5,1 cm)
x2
PARTS REQUIRED
2" (5,1 cm)
Nails
1-1/2" (3,8 cm)
Nails
Flush
6" (15,2 cm)
6"
(15,2 cm)
2" (5,1 cm)
Screw
Fig. B
2" (5,1 cm)
Screw
Fig. A
Secure wall top plate with (1) 3" screw
at the corner at an angle as shown
(Fig. D).
3
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
x1
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
Temporary Brace
TJ
3" (7,6 cm)
Screws
Nail 2" nails rst.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Nails
1-1/2"
(3,8 cm)