Installation Guide
74
STANDARD:
DOOR LOCATED
ON 12' GABLE WALL
OPTIONAL:
DOOR LOCATED
ON 24' EAVE WALL
2
Nail lower edge of panels
to oor with 2" nails
spaced 6" apart.
Angle nails into oor frame
(Fig. C).
Secure panel to 12' wall stud
with 1-1/2" nails spaced 6" apart.
1st 24' EAVE WALL 16 INSTALLATION
3" (7,6 cm)
x5
3" (7,6 cm)
x24
Place 1st 24' eave wall 16
centered on oor.
The 1-1/2" (3,8 cm) overlap
is to the top.
Use (2) TJ as a temporary brace,
as shown.
Secure TJ with (2) 3" screws.
Secure wall with (1) 2" screw
into 12' wall bottom plate (Fig. A)
and top plate (Fig. B).
Secure wall to bottom plate fi rst.
BEGIN
1
ENSURE PANEL CORNERS ARE FLUSH.
Your 1st 24' eave wall 16 is now installed.
FINISH
2" (5,1 cm)
x54
1-1/2" (3,8 cm)
x13
2" (5,1 cm)
x2
PARTS REQUIRED
2" (5,1 cm)
Nails
Flush
6" (15,2 cm)
6"
(15,2 cm)
2" (5,1 cm)
Screw
Fig. B
2" (5,1 cm)
Screw
Fig. A
Secure wall top plate with (1) 3" screw
at the corner at an angle, as shown
(Fig. D).
3
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
x2
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
Temporary Brace
TJ
TJ
3" (7,6 cm)
Screws
Nail 2" nails rst.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Nails
1-1/2"
(3,8 cm)
1-1/2" (3,8 cm)
Nails