Installation Guide

75
Secure wall with (1) 2" screw
through gable wall panel
into 12' wall bottom and top plates
(Fig. A, Fig. B).
Secure wall to bottom plate fi rst.
ENSURE PANEL CORNERS ARE FLUSH.
PARTS REQUIRED:
2nd 24' EAVE WALL 16 INSTALLATION
BEGIN
1
2
2" (5,1 cm)
x2
Flush
2" (5,1 cm)
Screw
Fig. B
Place 2nd 24' wall 16
centered on  oor.
The 1-1/2" (3,8 cm) overlap
is to the top.
Use TJ as a temporary brace
as shown.
Secure TJ with (2) 3" screws.
TJ
TJ
3" (7,6 cm)
Screws
3" (7,6 cm)
x4
x2
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
Temporary Brace
1-1/2"
(3,8 cm)
3" (7,6 cm)
x24
2" (5,1 cm)
x54
Nail 2" nails  rst.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Nails
3" (7,6 cm)
Nails
3
Nail lower edge of wall panels to  oor
frame with 2" nails spaced 6" apart.
Angle nails into  oor frame (Fig. C).
Secure wall bottom plates to  oor
with 3" nails (Fig. C).
6"
(15,2 cm)
2" (5,1 cm)
Screw
Fig. A