6558 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-888-827-9056 or email: customerservice@backyardproductsllc.
(This page intentionally left blank.
16558 ASSEMBLY MANUAL 02-04-2021 GABLE 10' x 12' (304,8 x 365,8 cm) BASE MODEL ADD 10' x 4' BUILDING SIZE 10' x 12' (304,8 x 365,8 cm) 10' x 16' (304,8 x 487,7 cm) ACTUAL FLOOR SIZE 10' x 12' (304,8 x 365,8 cm) 10' x 16' (304,8 x 487,7 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE Base Building +1 Extender 10' x 16' Base Building 10' x 12' IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
TOOLS Required ❑ Phillips Screwdriver Optional ❑ Tool Belt/ Nail Pouch ❑ Utility Knife ❑ Shingle Blades ❑ Drill / Driver ❑ 3/8" Drill Bit ❑ #2 Philips Drive Bit ❑ Tin Snips (for drip edge) ❑ Caulk Gun ❑ Hammer ❑ Chalk Line ❑ Paint Tools ❑ Level ❑ Nail Gun ❑ Pencil ❑ Safety Glasses ❑ Tape Measure ❑ Ladder ❑ Square • gun nails ❑ Gloves or ❑ Sawsall Safety! Always use approved safety glasses during assembly.
ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed does not include any floor or leveling materials. • See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. REINFORCED WOOD FLOOR FRAME (OPTIONAL) IMPORTANT! Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists (shown below as shaded).
ADDITIONAL MATERIALS COMPLETING YOUR SHED You will need these additional materials: 10x12' 10x16' ALL SIZES 3-TAB SHINGLES (Bundles).................. 6 8 PAINT FOR TRIM ...........................1 Quart PAINT FOR SIDING (Gallons)................ 3 3 CAULK ...10x12 - 3 Tubes ...10x16 - 4 Tubes 1" GALVANIZED ROOFING NAILS(lbs). 3 4 Use 100% acrylic latex exterior paint. Use 100% acrylic latex exterior paint. Use acrylic latex exterior caulk that is paintable. (2) coats recommended.
PARTS IDENTIFICATION AND SIZES Double letter part identification is stamped on some parts. WOOD SIZE CONVERSION CHART RS RS Nominal Board Size RS Actual Size 2 x 4 ..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1 x 4 .................3/4" x 3-1/2" (1,9 x 8,9 cm) • Check these locations for part stamp. 2 x 3 ..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1 x 3 .................3/4" x 2-1/2" (3,8 x 6,3 cm) 10x12' GABLE 10' x 12' PARTS LIST WALL INVENTORY YOUR PARTS before you begin.
PANEL & DOORS PARTS LIST NOTE: Panel parts are not stamped with part identification.
DOOR TRIM x2 AH x2 MDR 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) x2 MDL 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) x2 OO x1 ZJ 19/32" x 2-1/2" x 26-5/8" (1,5 x 6,3 x 67,7 cm) 69" (175,3 cm) Door Stiffener 19/32" x 2-1/2" x 72" (1,5 x 6,3 x 182,9 cm) Other HARDWARE (Not Actual Size) x1 x2 1" (2,5 cm) 1-1/4" (3,2 cm) x2 x2 x8 3/4" (1,9 cm) x2 7
PARTS IDENTIFICATION AND SIZES WOOD SIZE CONVERSION CHART Part identification is stamped on some parts. Nominal Board Size Actual Size 2 x 4 ..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1 x 4 .................3/4" x 3-1/2" (1,9 x 8,9 cm) RS RS 2 x 3 ..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1 x 3 .................3/4" x 2-1/2" (3,8 x 6,3 cm) • Check these locations for part stamp. 10x4' GABLE 10' x 4' EXTENDER KIT PARTS LIST WALL INVENTORY YOUR PARTS before you begin.
CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below. Attach the sill plates on the foundaton as shown, and continue on to page 14. Treated Sill Plate Caulk between sill plate and concrete. D D C 3-1/2" (8,9 cm) B A 4" (10,2 cm) Sill plates must be treated lumber.
OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS (Typical for 10' x 12' Kit) Runners are generally 12" (30,5 cm) from ends of floor frame and under seams. Measurements to centers of 4x4's. 12" (30,5 cm) • 3" Screws angled into 4x4. • (2) at each point frame and 4x4 touch.
LEVELING & SQUARING THE FLOOR FRAME (Not Included) LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. See page 10 for the preferred floor leveling method. BEGIN Use a level and ensure the frame is level before applying floor panels. 1 Check for frame squareness by measuring diagonally across the corners. If the measurements are the same, the frame is square.
I M PIMPORTANT! O R TA N T ! NOTE: 10' x 12' Gable shown standard throughout manual Ensure the floor frame is level after installing floor panels. Re-level if needed. R DOO • The floor should used as a stable work surface for wall construction. HINT: • Organize your assembly procedure during the build process to avoid over-handling of the walls.
(This page intentionally left blank.
WALL CONFIGURATION GUIDE Create your own style of shed. Choose your door location. Compare this guide with the wall index to find the corresponding pages. 10' x 12' V-1 V-2 02 05 02 04 02 05 04 01 06 03 07 03 10' x 16' V-1 02 09 08 09 10 01 V-2 02 HINT: V-3 02 08 11 03 09 12 03 Streamline your wall assembly process by cutting out the pages for the wall configuration guide and the wall index.
WALL INDEX As another option, eave walls with doors can be reversed during assembly. 10' x 12' After assembling the walls for your 10' x 12' shed, go to page 42 for wall installation. 10' x 12' Door is on the 10' wall. Wall 01: Page 18 Wall 02: Page 20 Wall 04: Page 24 Wall 05: Page 26 10' x 12' V-1 Door is on the 12' wall, centered. Wall 02: Page 20 Wall 03: Page 22 Wall 04: Page 24 Wall 06: Page 28 10' x 12' V-2 Door is on the 12' wall, offset.
DOOR HEADER Assemble this door header before building any walls! Any wall with a door will require this assembly. PARTS REQUIRED: x2 x1 x18 3" (7,6 cm) AM 2 x 4 x 67" (5,1 x 10,2 x 170,2 cm) 7/16 x 3-1/4 x 66-3/4" (1,1 x 8,3 x 170,2 cm) OSB BEGIN 1 Place (1) AM and OSB end-to-end on flat surface, flush in middle. Center OSB on top of AM. Fasten together with 3" nails in the pattern shown. 2 ASSEMBLED END VIEW Flip header assembly over and nail as shown on the other side.
WALL PANEL INSTALLATION HINTS & EXAMPLES PARTS REQUIRED: x40 GAA 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm ) x1 2" (5,1 cm) 2x3" TEMP. SPACER 3/4" GAUGE BLOCK Ensure your wall is square by installing one panel and squaring frame. Install all wall panels with the primed side facing up. BEGIN 1 2 2 Nails Place a 48" X 84" panel on the wall frame, as shown. Locate the panel 1-1/2" above the top plate. Use a 2 x 3 as a gauge block for the 1-1/2" top overhang measurement.
10' WALL - 01 PARTS REQUIRED: x2 x2 x6 x2 x1 SL UM AI TO x5 AL x72 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 3" (7,6 cm) x6 2 x 4 x 36" (5,1 x 10,2 x 91,4 cm) 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) 2 x 4 x 84" (5,1 x 10,2 x 213,4 cm) Pre Assembled Header BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards. Orient Pre Assembled Header on flat side (Fig. A).
10' WALL 01 PARTS REQUIRED: x2 x2 x150 11-7/8" x 84" (30,2 x 213,4 cm) x1 3 3" (7,6 cm) x1 x1 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. 3/4" (1,9 cm) 2" (5,1 cm) OO Temporary Brace 69" (75,3 cm) Door Stiffener Flush BEGIN HERE 2x3 1-1/2" (3,8 cm) 3/4" Gauge Block 3/4" Gauge Block 6" (15,2 cm) 4 Install the right panel flush to installed panel, as shown.
10' WALL 02 PARTS REQUIRED: x2 x6 x2 x28 3" (7,6 cm) RL 2 x 4 x 24" (5,1 x 10,2 x 61 cm) AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards. Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
10' WALL 02 PARTS REQUIRED: x1 23-7/8" x 84" (60,6 x 213,4 cm ) x136 48 x 84" (121,9 x 213,4 cm ) x2 2 Install 48" x 84" panel 1-1/2" from the top plate. 2" (5,1 cm) 1-1/2" (3,8 cm) 2x3 3/4" (1,9 cm) BEGIN HERE Use a 2x3 spacer for consistent measurement. 6" (15,2 cm) Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. 12" (30,5 cm) Note the panel lip-edge/square edge orientation.
10' WALL 03 PARTS REQUIRED: x32 x2 SL 3" (7,6 cm) 2 x 4 x 36" (5,1 x 10,2 x 91,4 cm) x7 AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x2 TO 2 x 4 x 84" (5,1 x 10,2 x 213,4 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards. Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
10' WALL 03 PARTS REQUIRED: x164 2" (5,1 cm) (x1 Left & x1 Right) x2 11-7/8" x 84" (30,2 x 213,4 cm) 48 x 84" (121,9 x 213,4 cm ) x2 2 Install 48" x 84" panel 1-1/2" from the top plate. 2x3 1-1/2" (3,8 cm) 3/4" (1,9 cm) BEGIN HERE Use a 2x3 spacer for consistent measurement. 6" (15,2 cm) Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. Note the panel lip-edge/square edge orientation.
12' WALL 04 PARTS REQUIRED: x24 x1 HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x2 YFA x5 3" (7,6 cm) TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) BEGIN 1 x1 Orient parts on edge on floor. Measure and mark from end of boards. HINT: Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
12' WALL 04 PARTS REQUIRED: x120 48 x 84" (121,9 x 213,4 cm ) x3 2 Install 48" x 84" panel 1-1/2" from the top plate. 2" (5,1 cm) 3-1/2" (8,9 cm) 2x3 3/4" (1,9 cm) BEGIN HERE 1-1/2" (3,8 cm) Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. 6" (15,2 cm) Note the panel lip-edge/square edge orientation.
12' WALL - 05 PARTS REQUIRED: x24 x1 HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x2 x1 3" (7,6 cm) TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) YFA 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) x5 AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark from end of boards. Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
12' WALL 05 PARTS REQUIRED: x1 x142 23-7/8" x 84" (60,6 x 213,4 cm ) 48 x 84" (121,9 x 213,4 cm ) x3 2 Install 48" x 84" panel 1-1/2" from the top plate. 2" (5,1 cm) 3/4" (1,9 cm) 2x3 1-1/2" (3,8 cm) BEGIN HERE Use a 2x3 spacer for consistent measurement. SQUARE EDGE Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. 6" (15,2 cm) Note the panel lip-edge/square edge orientation.
12' WALL 06 PARTS REQUIRED: x1 x2 x4 x1 x1 x5 AL x64 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) HVC UM AI TJ 3" (7,6 cm) x6 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) Pre Assembled Header x2 YFA 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards. Orient Pre Assembled Header on flat side (Fig. A).
12' WALL 06 PARTS REQUIRED: x1 x2 3" (7,6 cm) x132 23-7/8" x 84" (60,6 x 213,4 cm ) x1 3 3/4" (1,9 cm) Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. Secure panel with 2" nails spaced 6" apart on edges. x1 x1 2" (5,1 cm) OO Temporary Brace 69" (75,3 cm) Door Stiffener Flush BEGIN HERE 2x3 3/4" Gauge Block 3/4" Gauge Block 6" (15,2 cm) 4 Install the right panel flush to installed panel, as shown. Ensure 64" (162,8 cm) door measurement.
12' WALL 07 PARTS REQUIRED: x1 x2 x4 x1 x1 x5 AL 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) HVC UM AI TJ 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x66 3" (7,6 cm) x6 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) Pre Assembled Header x2 YFA 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards. Orient Pre Assembled Header on flat side (Fig. A).
12' WALL 07 PARTS REQUIRED: x2 3" (7,6 cm) x114 x1 48 x 84" (121,9 x 213,4 cm ) x1 x1 x1 2" (5,1 cm) OO Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. 3/4" (1,9 cm) BEGIN HERE Secure panel with 2" nails spaced 6" apart on edges. 2x3 6" (15,2 cm) 4 Install the right panel flush to installed panel, as shown. Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace.
16' WALL 08 PARTS REQUIRED: x36 x1 HVC 3" (7,6 cm) 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x2 SP x2 YFA 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x7 AI 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x1 TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark from end of boards. Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
16' WALL 08 PARTS REQUIRED: x170 x4 2" (5,1 cm) 48 x 84" (121,9 x 213,4 cm ) 2 Install 48" x 84" panel 1-1/2" from the top plate. 2x3 1-1/2" (3,8 cm) Use a 2x3 spacer for consistent measurement. 3/4" (1,9 cm) BEGIN HERE 6" (15,2 cm) SQUARE EDGE Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. 12" (30,5 cm) Note the panel lip-edge/square edge orientation. 3/4" Gauge Block 3/4" Gauge Block 3 Install (3) 48" x 84" panels flush to installed panels.
16' WALL 09 PARTS REQUIRED: x36 x1 HVC 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x2 SP x2 YFA 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x7 AI 3" (7,6 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x1 TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark from end of boards. Secure with (2) 3" nails at each connection and (4) 3" nails at seams.
16' WALL 09 PARTS REQUIRED: x2 x192 x3 23-7/8" x 84" (60,6 x 213,4 cm ) 2" (5,1 cm) 48 x 84" (121,9 x 213,4 cm ) 2 Install 48" x 84" panel 1-1/2" from the top plate. 1-1/2" (3,8 cm) 2x3 3/4" (1,9 cm) BEGIN HERE Use a 2x3 spacer for consistent measurement. 6" (15,2 cm) SQUARE EDGE Secure panel with 2" nails spaced 6" apart on edges and 12" inside panel. Note the panel lip-edge/square edge orientation.
16' WALL 10 PARTS REQUIRED: x1 HVC x76 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x2 SP 3" (7,6 cm) x6 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 3" (7,6 cm) x2 UM 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) x2 YFA 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) x6 AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) Pre Assembled Header x5 AL 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards.
16' WALL 10 PARTS REQUIRED: x2 3" (7,6 cm) x160 x2 x1 48 x 84" (121,9 x 213,4 cm ) x1 x1 OO Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. 3/4" (1,9 cm) BEGIN HERE Secure panel with 2" nails spaced 6" apart on edges. Flush 1-1/2" (3,8 cm) 2x3 6" (15,2 cm) 4 Flush Install the right panel flush to installed panel, as shown. Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace.
16' WALL 11 PARTS REQUIRED: x1 HVC x76 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x2 SP 3" (7,6 cm) x6 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 3" (7,6 cm) x2 UM 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) x2 YFA 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) x6 AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x1 TJ 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) Pre Assembled Header x1 x5 AL 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards.
16' WALL 11 PARTS REQUIRED: x2 x1 x2 x192 23-7/8" x 84" (60,6 x 213,4 cm ) x1 48 x 84" (121,9 x 213,4 cm ) 3" (7,6 cm) x1 x1 2" (5,1 cm) OO Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. 3/4" (1,9 cm) BEGIN HERE Secure panel with 2" nails spaced 6" apart on edges. 1-1/2" (3,8 cm) 2x3 6" (15,2 cm) 4 Flush Install the right panel flush to installed panel, as shown.
16' WALL 12 PARTS REQUIRED: x1 HVC x78 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) x2 SP 3" (7,6 cm) x6 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 3" (7,6 cm) x2 UM 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) x2 YFA 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) x6 AI 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) x1 TJ x1 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) Pre Assembled Header x5 AL 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) BEGIN 1 Orient parts on edge on floor as shown. Measure and mark from end of boards.
16' WALL 12 PARTS REQUIRED: x2 3" (7,6 cm) x163 x2 x1 48 x 84" (121,9 x 213,4 cm ) x1 x1 2" (5,1 cm) OO Temporary Brace 69" (75,3 cm) Door Stiffener 3 Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement. 3/4" (1,9 cm) BEGIN HERE 6" (15,2 cm) Secure panel with 2" nails spaced 6" apart on edges. 4 Flush Install the right panel flush to installed panel, as shown. Ensure 64" (162,8 cm) door measurement. Use part OO as a temporary brace.
STANDING YOUR WALLS The following steps show how to stand and secure your walls for a 10' x 12' shed. These instructions are by default with the door on the 10' gable wall. For 10' x 16' steps, start on page 48.
10' WALL INSTALLATION PARTS REQUIRED: x1 x10 OO 69" (175,3 cm) Door Stiffener 3" (7,6 cm) x2 3" (7,6 cm) x23 2" (5,1 cm) BEGIN 1-1/2" (3,8 cm) Center 10' wall on the 120" (304,8 cm) floor dimension. 1-1/2" (3,8 cm) overlap is to the top. DO O R Use OO as a temporary brace. Secure with (2) 3" screws. 3" (7,6 cm) Screws OO 2 Flush Secure lower edge of panel to floor frame with 2" nails spaced 6" apart. Angle nails into floor frame (Fig. A).
12' WALL INSTALLATION PARTS REQUIRED x27 x1 x2 3" (7,6 cm) 2" (5,1 cm) x13 x12 1-1/2" (3,8 cm) 3" (7,6 cm) Fig. B BEGIN 1 2" (5,1 cm) Place 12' wall centered on floor. 1-1/2" (3,8 cm) overlap is to the top. 2" (5,1 cm) Screw Secure wall with (1) 2" screw into 10' wall bottom plate (Fig. A) and top plate (Fig. B). Flush Secure wall to bottom plate first. ENSURE PANEL CORNERS ARE FLUSH. 2" (5,1 cm) Screw Fig.
12' WALL INSTALLATION PARTS REQUIRED: x2 x28 x13 x12 2" (5,1 cm) 1-1/2" (3,8 cm) 2" (5,1 cm) 2 3" (7,6 cm) 1-1/2" (3,8 cm) BEGIN 1 3" (7,6 cm) x1 Remove temporary brace OO from installed 10' wall. Place 12' wall centered on floor. 1-1/2" (3,8 cm) overlap is to the top. Fig. B 2" (5,1 cm) Screw Secure wall with (1) 2" screw through gable wall panel into 10' wall bottom and top plates (Fig. B, Fig. A). Secure wall to bottom plate first. 3" (7,6 cm) Nails ENSURE PANEL CORNERS ARE FLUSH.
10' WALL INSTALLATION PARTS REQUIRED x10 x2 2" (5,1 cm) 2" (5,1 cm) x26 x8 1-1/2" (3,8 cm) 3" (7,6 cm) Fig. B BEGIN 1 x4 3" (7,6 cm) 2" (5,1 cm) Screw Place 10' wall on floor centered between 12' walls. Secure wall with 2" screws into top and bottom plates (Fig. A, Fig. B). Secure wall to bottom plate first. Flush ENSURE PANEL CORNERS ARE FLUSH.
10' x 12' WALL DOUBLERS INSTALLATION PARTS REQUIRED: x2 x2 x2 SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x64 x2 JBD 2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm) TJ 3" (7,6 cm) x8 3" (7,6 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on top of wall frames. Secure from top with (2) 3" nails spaced every 24" (Fig. A). 2 Secure from bottom with (2) 3" screws at each corner (Fig. B). 3 Secure from bottom with (2) 3" screws at each corner (Fig. B).
16' WALL INSTALLATION PARTS REQUIRED: x1 x10 OO 69" (175,3 cm) Door Stiffener 3" (7,6 cm) x2 3" (7,6 cm) x23 2" (5,1 cm) BEGIN 1 1-1/2" (3,8 cm) DO O (304,8 cm) floor dimension. R Center 10' wall on the 120" 1-1/2" (3,8 cm) overlap is to the top. 3" (7,6 cm) Screws Use OO as a temporary brace. Secure with (2) 3" screws. OO Flush 2 DO Secure wall bottom plates to floor with 3" nails (Fig. A). OR Secure lower edge of panel to floor frame with 2" nails spaced 6" apart.
16' WALL INSTALLATION PARTS REQUIRED x1 x3 Temporary Brace TJ x2 3" (7,6 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) x36 x16 2" (5,1 cm) 2" (5,1 cm) x13 1-1/2" (3,8 cm) 3" (7,6 cm) Fig. B BEGIN 1 Place 16' wall centered on floor. 2" (5,1 cm) Screw The 1-1/2" (3,8 cm) overlap is to the top. Use TJ as a temporary brace as shown. Secure TJ with (2) 3" screws. Flush Secure wall with (1) 2" screw into 10' wall bottom plate (Fig. A) and top plate (Fig. B). Secure wall to bottom plate first.
16' WALL INSTALLATION PARTS REQUIRED: x1 TJ x2 x2 3" (7,6 cm) 2" (5,1 cm) Temporary Brace 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1 Remove temporary brace OO from installed 10' wall. 1-1/2" (3,8 cm) 3" (7,6 cm) Screws Place 16' wall centered on floor. 1-1/2" (3,8 cm) overlap is to the top. Use TJ as a temporary brace as shown. Secure TJ with (2) 3" screws. TJ 2" (5,1 cm) Screw Fig.
16' WALL INSTALLATION PARTS REQUIRED: x37 x16 x1 2" (5,1 cm) x13 1-1/2" (3,8 cm) 3" (7,6 cm) 3" (7,6 cm) 3 Nail lower edge of wall panels to floor frame with 2" nails spaced 6" apart. Angle nails into floor frame (Fig. C). 3" (7,6 cm) Nails Secure wall bottom plates to floor with 3" nails (Fig. C). 6" (15,2 cm) Nail 2" nails first. 3" (7,6 cm) Nails 2" (5,1 cm) Nails Fig. C 3" (7,6 cm) Screw Fig. D 4 Nail 12' wall panel to 10' wall stud with 1-1/2" nails spaced 6" apart.
10' WALL INSTALLATION PARTS REQUIRED x10 x2 2" (5,1 cm) 2" (5,1 cm) x26 x8 1-1/2" (3,8 cm) 3" (7,6 cm) Fig. B BEGIN 1 x4 3" (7,6 cm) 2" (5,1 cm) Screw Place 10' wall on floor centered between 16' walls. Secure wall with 2" screws into top and bottom plates (Fig. A, Fig. B). Secure wall to bottom plate first. Flush ENSURE PANEL CORNERS ARE FLUSH. Flush STANDARD: DOOR LOCATED ON 10' GABLE WALL 2" (5,1 cm) Screw 2 Nail lower edge of panels to floor with 2" nails spaced 6" apart.
10' x 16' WALL DOUBLERS INSTALLATION PARTS REQUIRED: x4 SP 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) x2 x2 x72 x2 JBD 2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm) TJ 3" (7,6 cm) x8 3" (7,6 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN 1 Orient parts on top of wall frames. Measure and mark from end of boards. Secure from top with (2) 3" nails spaced every 24" (Fig. A). 2 Secure from bottom with (2) 3" screws at each corner (Fig. B).
10x12' RAFTERS 10x16' PARTS REQUIRED: x12 x16 x14 x18 x144 x192 x1 OO Temporary Support 69" (175,3 cm) Door Stiffener 6 x 24" (15,2 x 60,9 cm) AD 2 x 4 x 65" (5,1 x 10,2 x 165,1 cm) 2" (5,1 cm) Build (2) rafter assemblies with (1) gusset (Fig. B). BEGIN Place two rafter-halves AD in the corner of back and side walls, flush to panels and studs. 1 Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown (FIg. A).
10x12' 10x16' PARTS REQUIRED: RAFTER INSTALLATION x5 x7 Two-Gusset Preassembled x2 x2 One-Gusset Preassembled x28 x36 3" (7,6 cm) BEGIN 1 Align rafters over the wall studs. Check that you have the measurements shown. Secure rafters with (2) 3" screws angled at each end (Fig. A, Fig. B). Secure rafters on opposite side. Maintain the measurements between rafters. DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS. 10' x 12' DIMENSIONS ARE TO CENTER OF RAFTERS.
GABLE UNITS PARTS REQUIRED: x24 x4 x2 x2 x2 1-1/2" (3,8cm) AF 2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm) Install gable panels with the primed side facing up. BEGIN 1 Orient parts AF on the flat side, as shown. Measure and mark the center of the middle gable panel. Secure with 1-1/2" nails spaced 6" apart along edge. 2 Place left panel on AF flush to installed gable panel and secure with 1-1/2" nails spaced 6" apart along edge. Repeat STEP 2 for right panel.
GABLE INSTALLATION PARTS REQUIRED: x8 3" (7,6 cm) x90 2" (5,1 cm) Pre - assembled BEGIN 1 Measure 2-9/16" down from top plate doubler and mark at each side as shown. Set gable unit on top plate. Fasten with (1) 2" nail on each side. BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING. 2 Continue nailing lower edge of panels to wall doubler with 2" nails spaced 6" apart. 3 Working inside, secure gable unit with (2) 3" screws angled into each AF at an angle (Fig. A).
10' x 12' ROOF PANELS PARTS REQUIRED: x4 3/4" GAUGE BLOCK 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) x1 2" (5,1 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). BEGIN 1 Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig. A) and the panel flush at the peak (Fig. B). Flush at peak Secure panel with (2) 2" nails in the corners. Fig. B 48 "x 96 " Gauge Block Fig.
10' x 12' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) x1 3 x12 Install a 48" x 47-7/8" roof panel flush to the installed panel and flush at peak (Fig. B). Fig. B Secure panel with (1) 2" nail in each corner. 4 Flush at peak 2" nails in each corner Move the gable end rafter edge until it is 1/2" from the 48" x 47-7/8" roof panel (Fig. C). Finish securing panel with (2) 2" nails in the corners. Flush 48 "x 47 -7/ 8" Mo ve Ga ble 1/2" (1,2 cm) Fig.
10' x 12' ROOF PANELS PARTS REQUIRED: x8 23-1/2" x 47-7/8" (59,7 x 121,9 cm) x1 3/4" GAUGE BLOCK 23-1/2" x 96" (59,7 x 243,8 cm) x1 6 2" (5,1 cm) Install 23-7/8" x 48" and 13-7/8" x 96" roof panels with a 3/4" measurement on the rafter (Fig A) and flush to the installed panels. Secure panels with (1) 2" nail in each corner. 3/4" (1,9 cm) Gauge Block 23 Fig.
10' x 12' ROOF PANELS PARTS REQUIRED: 7 x136 2" (5,1 cm) Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside of the 48" wide panels. 6" (15,2 cm) (30 12" ,5 cm ) Repeat steps to install roof panels on the opposite side. FINISH Your roof panels are now installed.
10' x 16' ROOF PANELS PARTS REQUIRED: x4 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) x1 2" (5,1 cm) 3/4" GAUGE BLOCK Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). BEGIN 1 Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B). Flush at peak Secure panel with (2) 2" nails in the corners. Fig.
10' x 16' ROOF PANELS PARTS REQUIRED: x18 2" (5,1 cm) 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) x2 3 Install 48" x 47-7/8" roof panel flush to the installed panel and flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner, as shown. Mo ve G 48 "x Fig. B ab Flush at peak le 47 -7/ 8" Flush 4 Move gable end rafter edge until it is 1/2" from the 48" x 47-7/8" roof panel (Fig. C). 2" nail in each corner Flush 48 "x Finish securing panel with (1) 2" nail in the outside corners.
10' x 16' ROOF PANELS PARTS REQUIRED: 23-1/2" x48" (59,7 x 121,9 cm) x1 3/4" GAUGE BLOCK Install 23-7/8" x 96" roof panel with a 3/4" measurement on the rafter (Fig A) and flush to the upper installed panels. Secure panels with (1) 2" nail in each corner. 7 2" (5,1 cm) 23-1/2" x 96" (59,7 x 243,8 cm) x1 6 x12 Install (2) 23-7/8" x 48" roof panels flush to the installed panels. Secure panels with (1) 2" nail in each corner. 3/4" (1,9 cm) Fig.
10' x 16' ROOF PANELS PARTS REQUIRED: 8 x190 Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside of the panels. 6" (15,2 cm) (30 12" ,5 cm ) Repeat all steps to install roof panels on the opposite side. FINISH Your roof panels are now installed.
GABLE TRIM PARTS REQUIRED: x2 x2 x48 2" (5,1 cm) AUR 19/32" x 3-1/2" x 71-15/16" (1,5 x 8,9 x 182,7 cm) AUL 19/32" x 3-1/2" x 71-15/16" (1,5 x 8,9 x 182,7 cm) BEGIN 1 Install front gable trim AUR and AUL flush to top of roof panel and flush at peak, as shown (Fig. A). Secure trim with 2" finishing nails 7-1/4" apart. Repeat above steps to secure the back wall gable trim. Fig.
10' x 12' EAVE TRIM PARTS REQUIRED: x2 x8 x62 3" (7,6 cm) AS 1-1/4" (3,2 cm) 2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm) x2 VX 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) BEGIN 1 Place VX eave trim flush along edge of roof panel (Fig. A). Screw through roof panel into VX with 1-1/4" screws spaced approximately 7-1/2" apart, as shown. 2 Install AS flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel into AS with 1-1/4" screws spaced approximately 7-1/2" apart, as shown.
10' x 16' EAVE TRIM PARTS REQUIRED: x2 VF VF 2 x 6 x 48" (5,1 x 15,2 x 121,9 cm) x2 x8 x2 x74 3" (7,6 cm) 1-1/4" (3,2 cm) AS 2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm) VX 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) BEGIN 1 Place VF eave trim flush along edge of roof panel (Fig. A). Screw through roof panel into VX with 1-1/4" screws spaced approximately 7-1/2" apart, as shown. 2 Install AS flush to edge of roof panel and flush to installed eave trim VX.
CORNER TRIM x64 PARTS REQUIRED: x8 2" (5,1 cm) 3/8" x 1-3/4" x 83-1/2" (1 x 4,5 x 212,1cm) BEGIN 1 Install gable end 83-1/2" corner trim under gable panel, (Fig. A) and flush to eave wall panel (Fig. B). Secure with 2" finishing nails spaced evenly. 2 Install eave side 83-1/2" corner trim flush to eave soffit and flush along seam of installed corner trim (Fig. C). Secure with 2" finishing nails spaced evenly. Fig. B Flush to eave panel Fig.
10' x 12' COLLAR TIE PARTS REQUIRED: x2 x12 3" (7,6 cm) TM 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) BEGIN 1 Install collar tie TM to the 3rd and 5th rafters from the front with (3) 3" nails at each end. 3" (7,6 cm) Nails Flush to panel Flush to panel TM 3rd 5t h TM FINISH HINT: For best appearance, install collar tie on back side of rafter. Your collar tie is now installed.
DOORS PARTS REQUIRED: x4 3" (7,6 cm) x2 x1 GAA 1-1/4" (3,2 cm) 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) x1 Left Door x1 x1 OO 69" (175,3 cm) Door Stiffener Right Door BEGIN 1 Place doors on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board. Attach temporary supports OO and GAA as shown. OFFSET 3/8" GREEN RED (1 cm) 3/8" (1 cm) 3/8" OFFSET (1 cm) (4) 3" (7,6 cm) Screws OO (2) 1-1/4" (3,2 cm) Screws GAA Bottom edges flush.
DOORS x12 PARTS REQUIRED: x1 2 3" (7,6 cm) OO TEMPORARY SUPPORT 69" (175,3 cm) Door Stiffener Install OO flush under panels. Secure to floor frame with (2) 3" screws (Fig. A). Mark center of door opening. Fig. A Flush against wall panels OO (2) 3" (7,6 cm) Screws OO TEMPORARY SUPPORT 3 Center doors on mark (Fig. B). 4 Screw hinge boards into wall supports with (10) 3" screws, as shown. Make sure screws go into framing. Center 3/8" measurement on mark. Fig.
DOORS PARTS REQUIRED: x7 x2 AH x62 2" (5,1 cm) 3/4" (1,9 cm) 19/32" x 2-1/2" x 26 5/8" (1,5 x 6,3 x 67,6 cm) x2 x2 MDR 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) 2 ZJ 19/32" x 2-1/2" x 72" (1,5 x 7,6 x 182,9 cm) MDL 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) BEGIN 1 x1 You have 3 options for door trim, see Fig. C. Fig. C Arrange trim AH, MDL and MDR as shown. Square AH before fastening. Fasten trim to each door from inside with 3/4" screws (Fig. A, Fig B).
DOOR STIFFENERS PARTS REQUIRED: x2 x14 2" (5,1 cm) OO 69" (175,3 cm) Door Stiffener BEGIN 1 Center OO vertically on the left door in the doorway (Fig. A) overlapping 1" (2,5 cm) along the edge of door (Fig. B). Secure with (7) 2" screws through outside trim into OO. 2 Center OO vertically on the right door in the door opening offset 1" (2,5 cm) from the edge of door (Fig. B). Secure with (7) 2" screws through outside trim into OO. Fig.
DOOR HARDWARE PARTS REQUIRED: x2 x8 5/16" (7,9 mm) Drill Bit 3/4" (1,9 cm) BEGIN 1 Place bolt on OO in open position with bolt end 3/8" (9,5 mm) down from frame. Bolt is open when loop is contacting base (Fig A). 2 Mark and pre-drill holes for screws. Install bolt with screws supplied. Drill 5/16" (7,9 mm) hole deep enough for bolt to slide into. 3 Place bolt on OO in open position with bolt end 1/2" (12,7 mm) up from floor. Bolt is open when loop is connecting base (Fig. B).
DOOR HARDWARE PARTS REQUIRED: x2 x1 x2 1-1/4" (3,2 cm) 1" (2,5 cm) 1/2" (13 mm) Drill Bit 1/4" (6 mm) Drill Bit BEGIN 1 Measure and mark location of hole on outside of right door as shown (Fig. A). Pre-drill hole with 1/4" drill. Re-drill hole with 1/2" drill. Keep drilled hole square to trim to avoid breaking edge of door stiffener. RIGHT DOOR 1-3/4" (4,4 cm) 35-3/4" (90 cm) 2 TOP VIEW 1-3/4" (4,4 cm) Secure backplate with 1" screws and handle with 1-1/4" screws as shown.
HOOK & EYE PARTS REQUIRED: ¸1 x2 BEGIN Install hooks in wall and into framing behind (Fig.A). 2 Fig. A Swing door open to locate eye. Hook Eye Install hook into framing, if possible. FINISH You have installed your hook & eyes.
VENT (Not included in kit.) • Follow directions provided by manufacturer and these instructions. x12 x2 16" x 8" 1/2" (13 mm) BEGIN 1 Locate and mark for two vents in side walls as shown; (1) at top and (1) at bottom. Cut out marked openings. Caulk behind vent flanges. Secure with 1/2" screws. 14" (35,6 cm) Caulk 6" (15,2 cm) 1/2" Screws (1,3 cm) 3"- 5" (7,6 - 12,7 cm) Caulk 7"- 8" (17,8 - 20,3 cm) 5" (12,7 cm) 6" (15,2 cm) 14" (35,6 cm) FINISH Your vents are now installed.
PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges Note: Prime all un-primed exterior wood before painting.
SHINGLES - NOT INCLUDED • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch SHINGLE NAIL PATTERN 1" (2,5 cm) 1/2" (1,3 cm) Notch Sealing Strip 1" (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. BEGIN 1 Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.
SHINGLES continued... 2 2 Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck FRONT OF SHED 1" (2,5 cm) Notch - or - BACK OF SHED Flush with starter row. Drip Edge Flush with starter row. Notch 3 Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row. FRONT OF SHED BACK OF SHED Bend in roof 1" (2,5 cm) Notch Flush with rain slots.
SHINGLES continued... 5 Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. Cut Off. 5" (12,7 cm) MAX. CUT Top of rain slot. 5" (12,7 cm) or less. • If more than 5" to rain slot you must install another row of shingles. 6 Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge.
SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN 1 Cut shingles in THREE pieces. Hint: Use cut-off pieces first. 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) Score shingle, then snap-off angled cut. Weather Seal 10x16' 30 to 32 Pieces 40 to 42 Pieces Top of slot.
SHINGLES - RIDGE CAP continued... 4 Continue installing ridge cap to back of roof. 5 Make sure there is 4" between the shingle-color and edge of shingles. 4" (10,2 cm) 6 Trim cap off flush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot. Cap 7 Install flush to shingles. Flush to shingles (2) Nails per side. FINISH You have finished your ridge cap.
16558 10' x 12' Order Form CATEGORY PART DESCRIPTION PART SIZE PART ITEM # BUILDING QTY. PART ID *LUM SPF 2X4X72 #2&BTR LUM SPF 2X4X96 #2&BTR LUM SPF 2X4X92-5/8 #2&BTR 2 X 4 X 44 3/8" PLATE 2 X 4 X 68-1/2" 2X4X48" DOUBLER/ PLATE/ CRATE 2 X 4 X 20 3/8" DOUBLER 2 X 4 X 24" DOUBLER / PLATE LUM SPF 2X4X84 #2&BTR 2 X 4 X 36" 2 X 4 X 78 1/2" 2 X 4 X 68" STUD 2 X 4 X 7" 2 X 4 X 67" 2 X 4 X 65" 22.5* RAFTER 2 X 4 X 18 1/8"-22.
LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: 1. Every product is warranted from defects in workmanship and manufacturing for 1 year. 2. All accessories, hardware and metal components are warranted for 2 years. 3. All Oriented Strand Board (OSB) is warranted for 2 years 4. Siding and Trim is warranted for 15 years. 5. LP Prostruct® Flooring is warranted for 10 years 6. Cedar lumber is warranted for 15 years. 7. Preserved Pine is warranted for 10 years. 8.