Installation Guide

52
10' WALL INSTALLATION
3" (7,6 cm)
x2
3" (7,6 cm)
x8
2
Place 10' wall on  oor centered between 16' walls.
Secure wall with 2" screws into top and bottom plates
(Fig. A, Fig. B).
Secure wall to bottom plate  rst.
1
Nail lower edge of panels to  oor with 2"
nails spaced 6" apart.
Angle nails into  oor frame (Fig. C).
Nail panels to 10' wall studs with 1-1/2"
nails spaced 6" apart.
ENSURE PANEL CORNERS ARE FLUSH.
Your walls are now installed.
FINISH
CUT OUT AND REMOVE BOTTOM PLATE
AT DOOR OPENING.
REMOVE TEMPORARY BRACING.
2" (5,1 cm)
x10
1-1/2" (3,8 cm)
x26
2" (5,1 cm)
x4
PARTS REQUIRED
Secure wall top plates with 3" screws
at each corner at an angle (Fig. D).
3
STANDARD:
DOOR LOCATED
ON 10' GABLE WALL
2" (5,1 cm)
Screw
2" (5,1 cm)
Nails
1-1/2"
(3,8 cm)
Nails
Flush
Flush
6"
(15,2 cm)
Fig. A
3" (7,6 cm)
Screw
Fig. D
Fig. B
3" (7,6 cm)
Nails
Nail 2" nails  rst.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Nails
2" (5,1 cm)
Screw