Installation Guide

19
Install the left panel 1-1/2"
from the top plate.
Use a 2x3 spacer for
consistent measurement.
Secure panel with 2"
nails spaced 6" apart on
edges.
Install the right panel ush
to installed panel,
as shown.
Ensure 64" (162,8 cm) door
measurement.
Use part OO as a
temporary brace. Secure
with with (2) 3" screws.
Secure panels with 2" nails
spaced 6" apart on edges.
2x3
2x32x3
PARTS REQUIRED:
10' WALL 01
2" (5,1 cm)
x150
x1 x1
6" (15,2 cm)
1-1/2"
(3,8 cm)
BEGIN HERE
3/4"
(1,9 cm)
Flush Flush
OO Temporary Brace
3" (7,6 cm)
x2
4
3
64"
(162,6 cm)
3" (7,6 cm)
Screw
3" (7,6 cm)
Screw
3/4"
(1,9 cm)
x1
69" (75,3 cm) Door Stiffener
OO Temporary Brace
Install (2) 11-7/8" x 84"
panels ush to installed
panels and 1-1/2" from
the top plate.
Secure panels with 2"
nails spaced 6" apart on
edges.
Note the panel
lip-edge/square edge
orientation.
Flush Flush
Flush
Flush
5
Your 10' WALL 01 is now
assembled.
Carefully ip the wall over.
FINISH
LIP EDGE
11-7/8"
(30,2 cm)
SQUARE
EDGE
11-7/8" x 84" (30,2 x 213,4 cm)
x2
1-1/2"
(3,8 cm)
6" (15,2 cm)
3/4" Gauge
Block
3/4" Gauge
Block
Flush