Installation Guide
53
PARTS REQUIRED:
14' EAVE WALL INSTALLATION
3" (7,6 cm)
x1
3" (7,6 cm)
x14
2" (5,1 cm)
x32
Nail 2" nails rst.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Nails
4
Nail 10' wall panel to 10' wall stud with
1-1/2" nails spaced 6" apart.
Your 2nd 14' wall is now installed.
FINISH
3" (7,6 cm)
Nails
1-1/2" (3,8 cm)
x13
Secure gable wall top plate with (1) 3" screw
at the corner at an angle as shown (Fig. D).
5
3
Nail lower edge of wall panels to oor frame
with 2" nails spaced 6" apart.
Angle nails into oor frame (Fig. C).
Secure wall bottom plates to oor
with 3" nails (Fig. C).
1-1/2" (3,8 cm)
Nails
6" (15,2 cm)
3" (7,6 cm)
Screw
Fig. D
6"
(15,2 cm)