Installation Guide

55
92-5/8" 20-3/8"
96"
96"
48"
24"
48"
24"
(243,8 cm)
(243,8 cm)
(121,9 cm)
(61 cm)
(121,9 cm)
(61 cm)
20-3/8" 92-5/8"
(235,3 cm) (51,8 cm)
(51,8 cm) (235,3 cm)
10' x 14' WALL DOUBLERS INSTALLATION
3" (7,6 cm)
x68
3" (7,6 cm)
x8
PARTS REQUIRED:
1
BEGIN
2
3
Orient parts on top of wall frames. Measure and mark from end of boards.
Secure from bottom with (2) 3" screws at each corner (Fig. B).
Your wall doublers are now installed.
FINISH
Fig. A
Secure from top with (2) 3" nails spaced every 24" (Fig. A).
x2
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
x2
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
x2
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
SP
DOOR
JBDTJ
TJ
SP
SP
RL
RL
TP
TP
Fig. B
3" (7,6 cm)
Nails
3" (7,6 cm)
Screws
JBD
2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm)
x2
JBD
GO TO PAGE 61 TO CONTINUE
BUILDING YOUR SHED.
Ensure all doubler seams are non-aligned
over seams of wall top plates.
Nail TYP.
24"
(61 cm)
2 x 4 x 24" (5,1 x 10,2 x 61 cm)
x2 RL