Installation Guide

61
96”
(243,8 cm)
96”
(243,8 cm)
Place two rafter-halves AD in the corner of back and side walls, ush to panels and studs.
Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown (FIg. A).
Place two rafter-halves AD in the corner of back and side walls, ush to panels and studs (STEP - 1).
Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown (FIg. A).
Build (2) rafter assemblies with (1) gusset (Fig. B).
Depending on your shed size, build 4, 6 or 8 rafter assemblies with (2) gussets (Fig. C).
BEGIN
1
2
3
FINISH
Your rafters are now assembled.
RAFTERS
2" (5,1 cm)
PARTS REQUIRED:
x168 x216x120
x16 x20x12
x14 x18x10
6 x 24" (15,2 x 60,9 cm)
10x14' 10x18'10x10'
x1
2 x 4 x 65" (5,1 x 10,2 x 165,1 cm)
AD
Flip over rafter assembly and fasten second gusset to other side with 2" nails (FIg. C).
Temporary support (OO)
Flush at peak
120"
(304,8 cm)
Fit base of rafters in corners
of back wall.
OO
69" (175,3 cm) Door Stiffener
SET ASIDE THESE TWO RAFTER ASSEMBLIES.
HINT:
Use oor and walls to help
assemble rafters!
Fig. B - Build 2 Fig. C - Build 4, 6 or 8
Fig. A
1/4"
(1,9 cm)
1/4"
(1,9 cm)
Temporary Support
Flush
120"
(304,8 cm)
120"
(304,8 cm)