Installation Guide
64
GABLE UNITS
PARTS REQUIRED:
6"
(15,2 cm)
2-1/2"
(6,4 cm)
1-3/4"
(4,4 cm)
3-1/2"
(8,9 cm)
2-1/2"
(6,4 cm)
2-1/2"
(6,4 cm)
Flush
x2 x2
AF
6"
(15,2 cm)
x4
2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm)
AF
Flush
2
Arrange (2) parts AF on the at side, as shown.
Secure with 1-1/2" nails spaced 6" apart along edge.
Place left and right panels on AF ush to installed panel.
Secure with 1-1/2" nails spaced 6" apart along edge.
Measure and mark the center of the middle gable panel.
Repeat steps to build the 2nd gable unit.
1
BEGIN
1-1/2" (3,8cm)
x24
1-1/2" (3,8 cm)
Nails
Flush
Flush
Install gable panels with the primed side facing up.
x2
Build (2) identical gable units.