Installation Guide
65
GABLE INSTALLATION
PARTS REQUIRED:
2" (5,1 cm)
x90
x8
3" (7,6 cm)
x2
6"
(15,2 cm)
2
3
4
1
BEGIN
Preassembled
Your gable units are now installed
Repeat steps to install the 2nd gable unit on the opposite side.
AF
NAIL FIRST
2" (5,1 cm)
NAIL FIRST
2" (5,1 cm)
DOUBLER
2-9/16"
(6,5 cm)
Measure and
Mark
2-9/16"
(6,5 cm)
Measure and
Mark
Fig. A
3" (7,6 cm)
Screws
Continue nailing lower edge of panels to wall doubler with 2" nails spaced 6" apart.
Continue securing panels to rafter with 2" nails spaced 6" apart.
Working inside, secure gable unit with (2) 3" screws angled into each AF at an angle (Fig. A).
Measure 2-9/16" down from top plate doubler and mark at each side as shown.
Set gable unit on top plate. Fasten with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
FINISH