Installation Guide

83
TM
2 x 4 x 72" (5,1 x 10,2 x 182,9 cm)
Install collar tie to the rafter with (3) 3" nails at each end
(Fig. A).
Starting at the wall with the door, install rst
collar tie TM on the 2nd rafter from the gable
wall and then on every other rafter, as shown.
FINISH
Your collar tie(s) are now installed.
3" (7,6 cm)
1
BEGIN
2nd
2nd
2nd
6th
6th
4th
4th
4th
8th
HINT:
For best appearance, install
collar ties on back side of rafter.
Fig. A
PARTS REQUIRED:
COLLAR TIE INSTALLATION
x18
x12 x24
x3
x2 x4
10x10'
10x14' 10x18'
Flush to roof
panel
GABLE WALL
GABLE WALL
GABLE WALL
3" (7,6 cm)
Nails
10' x 10'
10' x 14'
10' x 18'