Installation Guide
45
Flush
3" (7,6 cm)
x2
PARTS REQUIRED:
10' GABLE WALL INSTALLATION
3" (7,6 cm)
x10
2" (5,1 cm)
x23
OO
x1
69" (175,3 cm) Door Stiffener
3" (7,6 cm)
Nails
Center 10' wall on the 120" (304,8 cm) oor dimension.
1-1/2" (3,8 cm) overlap is to the top.
OO
BEGIN
1
1-1/2"
(3,8 cm)
3" (7,6 cm)
Screws
Secure lower edge of panel to oor frame with 2" nails spaced 6" apart.
Angle nails into oor frame (Fig. A).
Secure wall bottom plates to oor with 3" nails (Fig. A).
2
Your 1st 10' gable wall is now standing.
FINISH
Use OO as a temporary brace.
Secure with (2) 3" screws.
6"
(15,2 cm)
DOOR
DOOR
Nail 2" nails rst.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. A