Installation Guide

47
PARTS REQUIRED:
10' EAVE WALL INSTALLATION
3" (7,6 cm)
x1
3" (7,6 cm)
x10
2" (5,1 cm)
x23
4
Nail 10' eave wall panel to 10' gable wall
stud with 1-1/2" nails spaced 6" apart.
Your 2nd 10' eave wall is now installed.
FINISH
3" (7,6 cm)
Nails
1-1/2" (3,8 cm)
x13
Secure wall top plate with (1) 3" screw at the
corner at an angle as shown (Fig. D).
5
3
Nail lower edge of wall panels
to oor frame with 2" nails
spaced 6" apart.
Angle nails into oor frame
(Fig. C).
Secure wall bottom plates to oor
with 3" nails (Fig. C).
1-1/2" (3,8 cm)
Nails
6" (15,2 cm)
3" (7,6 cm)
Screw
Fig. D
6"
(15,2 cm)
Secure wall with (1) 2" screw through
gable wall panel into 10' wall bottom
and top plates (Fig. B, Fig. A).
Secure wall to bottom plate rst.
ENSURE PANEL CORNERS ARE FLUSH.
2
BEGIN
1
Remove temporary brace OO from
installed 10' gable wall.
Place 2nd 10' eave wall centered on oor
1-1/2" (3,8 cm) overlap is to the top.
Nail 2" nails rst.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. C
Flush
2" (5,1 cm)
Screw
Fig. B
Fig. A
2" (5,1 cm)
Screw
1-1/2"
(3,8 cm)
2" (5,1 cm)
x2