Installation Guide

3
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
• This shed does not include any oor or leveling materials.
• See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to properly level your oor,
as this will vary depending on your specic site.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT! Depending on your specic use you may want to construct a heavy duty oor frame by adding additional oor joists
(shown below as shaded). Below is a list of additional materials (not included):
x2
x3
x4
x8
x12
x16
2 x 4 x 10' (5,1 x 10,2 x 304,8 cm) Treated Lumber
cut to 2 x 4 x 117" (5,1 x 10,2 x 297,2 cm)
3" (7,6 cm) hot-dipped galvanized nails
2 x 4 x 10' (5,1 x 10,2 x 304,8 cm) Treated Lumber
cut to 2 x 4 x 117" (5,1 x 10,2 x 297,2 cm)
2 x 4 x 10' (5,1 x 10,2 x 304,8 cm) Treated Lumber
cut to 2 x 4 x 117" (5,1 x 10,2 x 297,2 cm)
3" (7,6 cm) hot-dipped galvanized nails
3" (7,6 cm) hot-dipped galvanized nails
10x14'
10x18'
10x10'
Optional 12" (30,5 cm) spacing
Standard 16" (40,5 cm) spacing
Optional 12" (30,5 cm) spacing
Standard 16" (40,5 cm) spacing
Optional 12" (30,5 cm) spacing
Standard 16" (40,5 cm) spacing