Installation Guide
48
10' GABLE WALL INSTALLATION
3" (7,6 cm)
x2
3" (7,6 cm)
x8
2
Place 10' gable wall on oor centered between
installed' walls.
Secure wall with 2" screws into top and bottom plates
(Fig. A, Fig. B).
Secure wall to bottom plate rst.
BEGIN
1
Nail lower edge of panels to oor with 2"
nails spaced 6" apart.
Angle nails into oor frame (Fig. C).
Nail panels to eave wall studs with
1-1/2" nails spaced 6" apart.
ENSURE PANEL CORNERS ARE FLUSH.
Your walls are now installed.
FINISH
CUT OUT AND REMOVE BOTTOM PLATE AT
DOOR OPENING.
2" (5,1 cm)
x10
1-1/2" (3,8 cm)
x26
2" (5,1 cm)
x4
PARTS REQUIRED
Secure wall top plates with 3" screws
at each corner at an angle (Fig. D).
3
STANDARD:
DOOR LOCATED
ON 10' GABLE WALL
OPTIONAL:
DOOR LOCATED
ON 10' EAVE WALL
2" (5,1 cm)
Screw
Flush
Flush
Fig. A
Fig. B
6"
(15,2 cm)
2" (5,1 cm)
Nails
1-1/2"
(3,8 cm)
Nails
6"
(15,2 cm)
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
Nail 2" nails rst.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Nails
Secure wall bottom plates to oor
with 3" nails (Fig. C).
2" (5,1 cm)
Screw










