14' EAVE WALL INSTALLATION
3" (7,6 cm)
x3
3" (7,6 cm)
x14
2
BEGIN
Place 1st 14' eave wall centered on oor.
The 1-1/2" (3,8 cm) overlap is to the top.
Use TJ as a temporary brace as shown.
Secure TJ with (2) 3" screws.
Secure wall with (1) 2" screw into 10' wall
bottom plate (Fig. A) and top plate (Fig. B).
Secure wall to bottom plate rst.
1
Nail lower edge of panels to oor
with 2" nails spaced 6" apart.
Angle nails into oor frame
(Fig. C).
Nail panel to 10' wall stud with
1-1/2" nails spaced 6" apart.
ENSURE PANEL CORNERS ARE FLUSH.
Your 1st 14' eave wall is now installed.
FINISH
2" (5,1 cm)
x32
1-1/2" (3,8 cm)
x13
2" (5,1 cm)
x2
PARTS REQUIRED
2" (5,1 cm)
Nails
1-1/2" (3,8 cm)
Nails
Flush
6" (15,2 cm)
6"
(15,2 cm)
2" (5,1 cm)
Screw
Fig. B
2" (5,1 cm)
Screw
Fig. A
Secure wall top plate with
(1) 3" screw at the corner
at an angle as shown
(Fig. D).
3
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
x1
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
TJ
Temporary Brace
TJ
3" (7,6 cm)
Screws
Nail 2" nails rst.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Nails
OPTIONAL:
DOOR LOCATED
ON 14' EAVE WALL
Secure wall bottom plates
to oor with 3" nails
(Fig. C).