Installation Guide
78
2" Nails
(5,1 cm)
AUR
AUL
Flush
Flush to top
of panel
Fig. A
Flush
Roof Panel
PARTS REQUIRED:
GABLE TRIM
x48
2" (5,1 cm)
Your gable trim is now installed.
Install front gable trim AUR and AUL ush to top of roof panel and ush at peak, as shown (Fig. A).
Secure trim with 2" nish nails 7-1/4" apart.
BEGIN
1
Repeat above steps to secure the back wall gable trim.
FINISH
19/32" x 3-1/2" x 71-15/16" (1,5 x 8,9 x 182,7 cm)
x2
AUR
19/32" x 3-1/2" x 71-15/16" (1,5 x 8,9 x 182,7 cm)
x2
AUL