Installation Guide
47
PARTS REQUIRED:
10' EAVE WALL INSTALLATION
3" (7,6 cm)
x1
3" (7,6 cm)
x10
2" (5,1 cm)
x23
4
Nail 10' eave wall panel to 10' gable wall
stud with 1-1/2" nails spaced 6" apart.
Your 2nd 10' eave wall is now installed.
FINISH
3" (7,6 cm)
Nails
1-1/2" (3,8 cm)
x13
Secure wall top plate with (1) 3" screw at the
corner at an angle as shown (Fig. D).
5
3
Nail lower edge of wall panels
to oor frame with 2" nails
spaced 6" apart.
Angle nails into oor frame
(Fig. C).
Secure wall bottom plates to oor
with 3" nails (Fig. C).
1-1/2" (3,8 cm)
Nails
6" (15,2 cm)
3" (7,6 cm)
Screw
Fig. D
6"
(15,2 cm)
Secure wall with (1) 2" screw through
gable wall panel into 10' wall bottom
and top plates (Fig. B, Fig. A).
Secure wall to bottom plate rst.
ENSURE PANEL CORNERS ARE FLUSH.
2
BEGIN
1
Remove temporary brace OO from
installed 10' gable wall.
Place 2nd 10' eave wall centered on oor
1-1/2" (3,8 cm) overlap is to the top.
Nail 2" nails rst.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. C
Flush
2" (5,1 cm)
Screw
Fig. B
Fig. A
2" (5,1 cm)
Screw
1-1/2"
(3,8 cm)
2" (5,1 cm)
x2










