Installation Guide

3
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
• This shed does not include any oor or leveling materials.
• See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to properly level your oor,
as this will vary depending on your specic site.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT! Depending on your specic use you may want to construct a heavy duty oor frame by adding additional oor joists
(shown below as shaded). Below is a list of additional materials (not included):
x2
x3
x8
x12
2 x 4 x 10' (5,1 x 10,2 x 304,8 cm) Treated Lumber
cut to 2 x 4 x 117" (5,1 x 10,2 x 297,2 cm)
3" (7,6 cm) hot-dipped galvanized nails
2 x 4 x 10' (5,1 x 10,2 x 304,8 cm) Treated Lumber
cut to 2 x 4 x 117" (5,1 x 10,2 x 297,2 cm)
3" (7,6 cm) hot-dipped galvanized nails
10x14'
10x10'
Optional 12" (30,5 cm) spacing
Standard 16" (40,5 cm) spacing
Optional 12" (30,5 cm) spacing
Standard 16" (40,5 cm) spacing
x4
x16
2 x 4 x 10' (5,1 x 10,2 x 304,8 cm) Treated Lumber
cut to 2 x 4 x 117" (5,1 x 10,2 x 297,2 cm)
3" (7,6 cm) hot-dipped galvanized nails
10x18'
Optional 12" (30,5 cm) spacing
Standard 16" (40,5 cm) spacing