Installation Guide
64
3
2
Set gable center panel on top of (2) QL,
as shown.
Measure and mark the 12" (30, cm)
center of the gable panel and
7-1/2" (19,1 cm) from bottom of panel.
Arrange trim parts as shown, with all
connections ush.
Secure with 2" nishing nails,
(2) in each part.
Turn the panel (with trim attached) over.
Secure each part with 3/4" screws
between nails, as shown.
Snip off the protruding nails.
You are nished with the
temporary supports.
Set them aside.
1
BEGIN
1
BEGIN
Your gable panel with hay loft trim is now assembled.
FINISH
2 x 4 x 39" (5,1 x 10,2 x 99,1 cm)
x2
QL
x1
2" (5,1 cm)
Finishing Nails
3" (7,6 cm)
Screws
PARTS REQUIRED:
GABLE HAY LOFT TRIM
3/4" (1,9 cm)
x20
2" (5,1 cm)
x14
Center
Temporary Support
Temporary Support
Flush all
connections
KX
x4
19/32" x 2-1/2" X 21-3/4" (1,6 x 7,6 x 55,2 cm)
x2
19/32" x 2-1/2" x 12-7/8" (1,6 x 7,6 x 32,7 cm)
JGA
x1
LKA
19/32" x 2-1/2" x 25-3/4" (1,6 x 7,6 x 65,4 cm)
12"
(30,5 mm)
7-1/2"
(19,1 mm)
12"
(30,5 mm)
QL
JGA
JGA
KX
KX
KX KX
LKA










