Installation Guide

65
GABLE PANELS
PARTS REQUIRED:
Flush
Flush
Flush
Flush
x2 x1
2
Orient parts QL on the at side, as shown.
Measure and mark the center of the middle gable panel. Secure with 1-1/2" nails spaced 6" apart along edge.
Place end panels on QL ush to installed panel and secure with 1-1/2" nails spaced 6" apart along edge.
Repeat STEP 2 for right panel.
Repeat STEPS 1 - 3 for opposite side gable panels.
1
BEGIN
1
BEGIN
1-1/2" (3,8cm)
x24
Install gable panels with the primed side facing up.
Mark
Mark
x2
Your gable units are now assembled.
FINISH
2 x 4 x 39" (5,1 x 10,2 x 99,1 cm)
x4
QL
6"
(15,2 cm)
1-3/4"
(4,4 cm)
1-3/4"
(4,4 cm)
1-1/2"
(3,8 cm)
QL
1-1/2" (3,8 cm)
Nails
6"
(15,2 cm)
6"
(15,2 cm)
1-1/2" (3,8 cm)
Nails
1-1/2" (3,8 cm)
Nails
6"
(15,2 cm)
1-3/4"
(4,4 cm)
1-3/4"
(4,4 cm)
1-1/2"
(3,8 cm)
QL
1-1/2" (3,8 cm)
Nails
x1