Installation Guide
66
GABLE INSTALLATION
PARTS REQUIRED:
2" (5,1 cm)
x114
x8
3" (7,6 cm)
6"
(15,2 cm)
2
1
BEGIN
Your gable units are now installed.
Repeat steps for installation of the opposite side 10' gable (with hay loft trim).
QL
NAIL FIRST
2" (5,1 cm)
NAIL FIRST
2" (5,1 cm)
DOUBLER
2-9/16"
(6,5 cm)
Measure and
Mark
2-9/16"
(6,5 cm)
Measure and
Mark
Continue nailing lower edge of panels to wall doubler with 2" nails spaced 6" apart.
Working inside, secure gable unit with (2) 3" screws angled into each QL at an angle (Fig. A).
Measure 2-9/16" down from top plate doubler and mark at each side as shown.
Set gable unit on top plate. Fasten with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
FINISH
Pre - assembled
Fig. A
3" (7,6 cm)
Screws










