Installation Guide

81
Install collar tie to the rafter with (3) 3" nails at each end
(Fig. A).
Starting at the wall with the door, install rst
collar tie TP on the 2nd rafter from the gable
wall and then on every other rafter, as shown.
FINISH
Your collar tie(s) are now installed.
3" (7,6 cm)
1
BEGIN
2nd
2nd
2nd4th
6th8th
4th
4th6th
HINT:
For best appearance, install
collar ties on back side of rafter.
Fig. A
PARTS REQUIRED:
COLLAR TIE INSTALLATION
x18
x12 x24
x3
x2 x4
10x10'
10x14' 10x18'
Flush to roof
panel.
GABLE WALL
GABLE WALL
GABLE WALL
3" (7,6 cm)
Nails
10' x 10'
10' x 14'
10' x 18'
2 x 4 x 96" (5,1 x 10,2 x 243,9 cm)
TP