AssemblyInstructions

55
Solar Shed
Installing Gable Trim
2 JB Gable Trim 1 x 4 x 42
5
/8 2 x 10 x 130cm
2 KN Gable Trim 1 x 4 x 87
7
/8 2 x 10 x 223.2cm
2 HN Gable Trim 1 x 3 x79
5
/16 2 x 7.6 x 201.4cm
2 -- Plywood Gable Cap 9
7
/8” x 29
5
/16 24 x 74cm
2 -- Soffit End Cap 7
7
/8 x3
15
/16 x7
1
/2 20x10x19cm
10
Space
Flush
10B
10C
10A
Plywood Gable Cap
scrap wood
JB
KN
Soffit
End
Cap
HN
10A. Place Plywood Gable Cap flush to top of roof
panel.
*Hint* Use a scrap piece of wood to help
align to top of roof
Secure Plywood Gable Cap in place using
seven 2” (5
cm) nails.
10B. Place JB and KN Tight to Gable Cap
and flush with top of roof panel.
Place Soffit End Cap Flush with JB and top of
roof Panel.
Nail in place with 2” (5
cm) nails.
10C. Place HN as shown covering wall
joint, and in between Soffit End Cap and KN.
Nail in place using 2” (5
cm) nails.
Note: If you have
purchased the optional
window, see optional
window installation on
Page 62 before installing
HN.