User Manual

33
Parts Needed
• Fuselage
• Balsa dowels
• Heat-shrink tubing
• Threaded rod (1/16") (4)
• Plain rod (1/16")
• Nylon tube
• Plastic clevis (4)
• EZ Connector
Tools and Adhesives Needed
• Thin CA glue
• Nylon thread
• Drill
• Drill Bit: 1/16", 1/8"
• Heat gun
• Hobby knife
• Needle-nose pliers
• Z-bend pliers
• Felt-tipped pen or pencil
• Phillips screwdriver
• Ruler
Step 1. Locate the parts that make up the pushrods.
Step 2. Using a felt-tipped pen or pencil, mark 1" from one end
of both dowel rods (two places). Repeat marking 1" from the
end, but 90° marked to first hole marked on body rods.
Step 3. Drill a 1/16" hole through the balsa dowels at the two
marked positions, as shown below.
Step 4. Select one of the dowels and make a second mark 1
1
/
4
"
from the end. This dowel will be used to make up the elevator
pushr
od, which has two rods so the split elevators can be activated.
Step 5. Drill a 1/16" hole at this mark, next to the first hole
drilled at that end. Refer to the illustration below.
Section 15: Installing the Control Linkages