User Manual

22
Twin Otter ARF Assembly Manual
􀀀 􀀀 Step 1
Position the rewall drilling template against the
rewall and ush with its edges. Tape it in place with
low-tack tape then use a felt-tipped pen to mark the
2-stroke engine mounting holes.
􀀀 􀀀 Step 2
Remove the template and use a 1/16-inch drill bit in a
pin vise to pilot drill the mounting holes.
Note: When drilling the upper hole use care not to drill
too far beyond the rewall and into the berglass of
the nacelle.
􀀀 􀀀 Step 3
Use an 11/64-inch drill bit in a drill motor to enlarge
the mounting holes.
􀀀 􀀀 Step 4
Use a cutoff wheel in a rotary tool to shorten one of
the 6-32 Allen head machine screws to a length of 3/4
inches. Also modify one 6-32 blind nut by removing
one side of the ange as shown.
􀀀 􀀀 Step 5
Press the blind nuts into the mounting holes from
inside the nacelle. The modied blind nut is installed
in the left mounting hole against the side of the motor
box. Use the 6-32 x 3/4-inch screw with a #6 washer
and engine mount to draw the blind nuts into place
with a 7/64-inch hex wrench.
􀀀 􀀀 Step 6
Measure 13/16 inch (20mm) across from the lower
left-hand engine mount hole and drill a 1/8-inch hole
for the throttle pushrod.