User Manual

23
Twin Otter ARF Assembly Manual
􀀀 􀀀 Step 7
Use a ruler to measure the vertical centerline of the
rewall and mark it with a felt-tipped pen. Measure
down 1 9/32 inch from the top of the rewall and mark
a horizontal line.
􀀀 􀀀 Step 8
Use a drill motor and 5/16-inch drill bit to drill a hole
5/32 inch each side of the centerline.
􀀀 􀀀 Step 9
Use a round le to remove the material between the
holes, creating a slot measuring 5/16 x 5/8 inches.
􀀀 􀀀 Step 10
Place a #6 steel washer onto each of the 6-32 Allen
head machine screws. Insert the screws and washers
in the engine mounts, noting that the modied screw
locates in the lower of the two holes under the beveled
edge of the right-hand mount.
􀀀 􀀀 Step 11
Apply a drop of threadlock to each of the screws then
use a 7/64-inch hex wrench to secure the mounts to
the rewall.
􀀀 􀀀 Step 12
Perform steps 1 through 7 beginning on page 20 to
install the cowling on the nacelle. Set the front face of
the cowl 3 7/16 inches from the rewall when taping it
in place to drill the mounting holes in the nacelle.